__TOC__
 
==[[Fall 2014 Commissioning Plan#One Week Pause in Running|Main Page]]==
 
 
==[[Tune Electron Beam]]==
 
==[[Tune Photon Beam]]==
 
 
==One Week Pause in Running==
 
==One Week Pause in Running==
 
* Goal: Reinstall tagger detectors/electronics and check data.
 
* Goal: Reinstall tagger detectors/electronics and check data.
* Schedule: Start Oct 14, duration 5-7 days depends on the accelerator program to be carried out meanwhile
+
* Expected Schedule: See start dates in the run coordination meeting pages [https://halldweb1.jlab.org/wiki/index.php/Run_Coordination_Meetings#Meeting_General_Agenda here] and the general schedule [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan#Run_Plan here]: Duration of the pause: 6 days, depends on the accelerator program to be carried out meanwhile  
 
* Responsibility: Hall D
 
* Responsibility: Hall D
 
* Priority: High
 
* Priority: High
 
* Conditions:
 
* Conditions:
# Beam off in the Hall.
+
# No beam, Tagger hall and Hall D are open.
  
 
* Acivities
 
* Acivities
# Reinstall the tagger detector, TAGM and the electronics, reconnect the cables.
+
# Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
# Check validity of the data taken so far. Use as feedback to detector settings.
+
# Remove upstream collimator.
# Check/modify the online monitoring histograms based on data.
+
# Analyze the data taken so far and identify possible problems.
 +
# Use this downtime to fix the identified hardware issues.
 
# Using reconstructed tracks find the location of the beam spot
 
# Using reconstructed tracks find the location of the beam spot
  
==[[Collect Beam Data for Detector Checkout]]==
+
[https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page]
==[[Optimize Detector Settings]]==
+
==[[Drift Chamber Alignment]]==
+
==[[Collect More Regular Data]]==
+

Latest revision as of 10:16, 20 October 2014

One Week Pause in Running

  • Goal: Reinstall tagger detectors/electronics and check data.
  • Expected Schedule: See start dates in the run coordination meeting pages here and the general schedule here: Duration of the pause: 6 days, depends on the accelerator program to be carried out meanwhile
  • Responsibility: Hall D
  • Priority: High
  • Conditions:
  1. No beam, Tagger hall and Hall D are open.
  • Acivities
  1. Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
  2. Remove upstream collimator.
  3. Analyze the data taken so far and identify possible problems.
  4. Use this downtime to fix the identified hardware issues.
  5. Using reconstructed tracks find the location of the beam spot

Back to main Fall14 commissioning page