Difference between revisions of "One Week Pause in Running"

From Hall D Ops Wiki
Jump to: navigation, search
(One Week Pause in Running)
(One Week Pause in Running)
Line 4: Line 4:
 
==[[Tune Photon Beam]]==
 
==[[Tune Photon Beam]]==
 
==One Week Pause in Running==
 
==One Week Pause in Running==
# Goal: Reinstall tagger detectors and check data.
+
# Goal: Reinstall tagger detectors/electronics and check data.
 
# Responsibility: HallD
 
# Responsibility: HallD
 
# Conditions:
 
# Conditions:
 
#* Beam off in the Hall.
 
#* Beam off in the Hall.
 
# Acivities
 
# Acivities
#* Reinstall the tagger detectors, TAGM and TAGH.
+
#* Reinstall the tagger detector, TAGM and the electronics, reconnect the cables.
 
#* Check validity of data offline. Use as feedback to detector settings.
 
#* Check validity of data offline. Use as feedback to detector settings.
 
#* Check/modify the online monitoring histograms based on data.
 
#* Check/modify the online monitoring histograms based on data.

Revision as of 12:06, 2 July 2014

Main Page

Tune Electron Beam

Tune Photon Beam

One Week Pause in Running

  1. Goal: Reinstall tagger detectors/electronics and check data.
  2. Responsibility: HallD
  3. Conditions:
    • Beam off in the Hall.
  4. Acivities
    • Reinstall the tagger detector, TAGM and the electronics, reconnect the cables.
    • Check validity of data offline. Use as feedback to detector settings.
    • Check/modify the online monitoring histograms based on data.

Collect Beam Data for Detector Checkout

Optimize Detector Settings

Drift Chamber Alignment

Collect More Regular Data