==[[Fall 2014 Commissioning Plan|Main Page]]==
+
==[[Fall 2014 Commissioning Plan#One Week Pause in Running|Main Page]]==
 +
 
 
==[[Tune Electron Beam]]==
 
==[[Tune Electron Beam]]==
 
==[[Tune Photon Beam]]==
 
==[[Tune Photon Beam]]==

Revision as of 12:11, 2 July 2014

Main Page

Tune Electron Beam

Tune Photon Beam

One Week Pause in Running

  1. Goal: Reinstall tagger detectors/electronics and check data.
  2. Responsibility: HallD
  3. Conditions:
    • Beam off in the Hall.
  4. Acivities
    • Reinstall the tagger detector, TAGM and the electronics, reconnect the cables.
    • Check validity of data offline. Use as feedback to detector settings.
    • Check/modify the online monitoring histograms based on data.

Collect Beam Data for Detector Checkout

Optimize Detector Settings

Drift Chamber Alignment

Collect More Regular Data