Difference between revisions of "One Week Pause in Running"
From Hall D Ops Wiki
(→One Week Pause in Running) |
(→One Week Pause in Running) |
||
Line 6: | Line 6: | ||
==One Week Pause in Running== | ==One Week Pause in Running== | ||
* Goal: Reinstall tagger detectors/electronics and check data. | * Goal: Reinstall tagger detectors/electronics and check data. | ||
− | * Schedule: Start Oct | + | * Schedule: Start Oct 8, duration 6 days depends on the accelerator program to be carried out meanwhile |
* Responsibility: Hall D | * Responsibility: Hall D | ||
* Priority: High | * Priority: High | ||
Line 15: | Line 15: | ||
# Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables. | # Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables. | ||
# Analyze the data taken so far and identify possible problems. | # Analyze the data taken so far and identify possible problems. | ||
− | # Use | + | # Use this downtime to fix the identified hardware issues. |
# Using reconstructed tracks find the location of the beam spot | # Using reconstructed tracks find the location of the beam spot | ||
Revision as of 18:28, 19 August 2014
Contents
Main Page
Tune Electron Beam
Tune Photon Beam
One Week Pause in Running
- Goal: Reinstall tagger detectors/electronics and check data.
- Schedule: Start Oct 8, duration 6 days depends on the accelerator program to be carried out meanwhile
- Responsibility: Hall D
- Priority: High
- Conditions:
- No beam, Tagger hall and Hall D are open.
- Acivities
- Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
- Analyze the data taken so far and identify possible problems.
- Use this downtime to fix the identified hardware issues.
- Using reconstructed tracks find the location of the beam spot