Difference between revisions of "One Week Pause in Running"

From Hall D Ops Wiki
Jump to: navigation, search
(One Week Pause in Running)
Line 1: Line 1:
__TOC__
 
==[[Fall 2014 Commissioning Plan#One Week Pause in Running|Main Page]]==
 
 
==[[Tune Electron Beam]]==
 
==[[Tune Photon Beam]]==
 
 
==One Week Pause in Running==
 
==One Week Pause in Running==
 
* Goal: Reinstall tagger detectors/electronics and check data.
 
* Goal: Reinstall tagger detectors/electronics and check data.
Line 18: Line 13:
 
# Using reconstructed tracks find the location of the beam spot
 
# Using reconstructed tracks find the location of the beam spot
  
==[[Collect Beam Data for Detector Checkout]]==
+
[https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page]
==[[Optimize Detector Settings]]==
+
==[[Drift Chamber Alignment]]==
+
==[[Collect More Regular Data]]==
+

Revision as of 10:11, 21 August 2014

One Week Pause in Running

  • Goal: Reinstall tagger detectors/electronics and check data.
  • Schedule: Start Oct 8, duration 6 days depends on the accelerator program to be carried out meanwhile
  • Responsibility: Hall D
  • Priority: High
  • Conditions:
  1. No beam, Tagger hall and Hall D are open.
  • Acivities
  1. Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
  2. Analyze the data taken so far and identify possible problems.
  3. Use this downtime to fix the identified hardware issues.
  4. Using reconstructed tracks find the location of the beam spot