Difference between revisions of "One Week Pause in Running"
From Hall D Ops Wiki
(→One Week Pause in Running) |
|||
Line 1: | Line 1: | ||
==One Week Pause in Running== | ==One Week Pause in Running== | ||
* Goal: Reinstall tagger detectors/electronics and check data. | * Goal: Reinstall tagger detectors/electronics and check data. | ||
− | * Schedule: | + | * Expected Schedule: |
+ | ** Oct 8 - Oct 13 : 6 days, depends on the accelerator program to be carried out meanwhile | ||
* Responsibility: Hall D | * Responsibility: Hall D | ||
* Priority: High | * Priority: High |
Revision as of 19:03, 22 August 2014
One Week Pause in Running
- Goal: Reinstall tagger detectors/electronics and check data.
- Expected Schedule:
- Oct 8 - Oct 13 : 6 days, depends on the accelerator program to be carried out meanwhile
- Responsibility: Hall D
- Priority: High
- Conditions:
- No beam, Tagger hall and Hall D are open.
- Acivities
- Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
- Analyze the data taken so far and identify possible problems.
- Use this downtime to fix the identified hardware issues.
- Using reconstructed tracks find the location of the beam spot