One Week Pause in Running

From Hall D Ops Wiki
Revision as of 10:47, 2 July 2014 by Cmeyer (Talk | contribs) (One Week Pause in Running)

Jump to: navigation, search

Main Page

Tune Electron Beam

Tune Photon Beam

One Week Pause in Running

  1. Goal: Reinstall tagger detectors and check data.
  2. Responsibility: HallD
  3. Conditions:
    • Beam off in the Hall.
  4. Acivities
    • Reinstall the tagger detectors, TAGM and TAGH.
    • Check validity of data offline. Use as feedback to detector settings.
    • Check/modify the online monitoring histograms based on data.

Collect Beam Data for Detector Checkout

Optimize Detector Settings

Drift Chamber Alignment

Collect More Regular Data