Difference between revisions of "Optimize Detector Settings"

From Hall D Ops Wiki
Jump to: navigation, search
Line 26: Line 26:
 
*Activities
 
*Activities
  
# (High) Re-establish the beam and measure the position at the  
+
# (High) Re-establish the beam and measure the position at the:
 +
#* Tagger Dump using the second Beam Profiler <math>\Box</math>
 +
#** System expert: Hovanes Egyian
 +
#** <span style="color:#ff00ff">Procedure for getting beam position with beam dump profiler</span>
 +
#*Active collimator <math>\Box</math>
 +
#** System expert: Richard Jones/Hovanes Egyian
 +
#** <span style="color:#ff00ff">Procedure for reading beam position from the Active collimator</span>
 
#* 2 Profilers (Hall D).<math>\Box</math>
 
#* 2 Profilers (Hall D).<math>\Box</math>
 
#** System expert: Hovanes Egyian
 
#** System expert: Hovanes Egyian

Revision as of 11:17, 21 August 2014

  • Goal: Finalize the photon beam commissioning. Verify optimal settings for detectors.
  • Responsibility: HallD
  • Conditions:
  1. Hall D controlled quadrupole MQPAD00 remained turned off. \Box \Box
    • Responsibility: MCC
  2. Monitoring available in counting room:
    • control screens \Box \Box
    • alarm handlers \Box \Box
    • relevant MCC screens \Box \Box
    • Procedure for bringing up control/MCC/alarm screens
    • System expert: David Lawrence.
  3. Tagger hall equipment in place and operating. \Box
  4. Beam 50nA CW
  5. Radiator is 1.7 10-5.\Box
  6. Pair spectrometer field on, converter inserted \Box
    • System expert: Alexander Somov
    • Procedure for turning on Pair Spectrometer field
    • Procedure for inserting/removing converters
  7. Collimator hole is 5mm.\Box
  8. Solenoid on at 300A.\Box
  9. 1st Profiler in front of the Solenoid and surveyed. 2nd profiler remains in front of beam dump.\Box
  10. GlueX detectors are on.\Box
  11. No target.\Box
  • Activities
  1. (High) Re-establish the beam and measure the position at the:
    • Tagger Dump using the second Beam Profiler \Box
      • System expert: Hovanes Egyian
      • Procedure for getting beam position with beam dump profiler
    • Active collimator \Box
      • System expert: Richard Jones/Hovanes Egyian
      • Procedure for reading beam position from the Active collimator
    • 2 Profilers (Hall D).\Box
      • System expert: Hovanes Egyian
      • Procedure for getting beam position with first profiler
    • Pair Spectrometer harp (Hall D).\Box
      • System expert: Alexander Somov
      • Procedure to extract beam position at scanner
  2. (High) Compare the beam position measurements. Consider moving the collimator from the nominal position if deviations of >5 mm are observed \Box
  3. (High) Re-calibrate the Active Collimator in X (use the slide) and Y, without the Profiler in front (Hall D).
  4. (High) Move the collimator 5 mm hole in X, ±30 mm around the center in order to calibrate the Active Collimator X-response. Leave the collimator in the nominal position (0.5 mm hole at the nominal center) (Hall D)
  5. (Moderate) Request control access, rotate the Active collimator by 90 degree. To rotate collimator should take about 5min. Accessing the Hall, leaving it and requesting beam should take 1h. Assumed total time: 2h. (Hall D)
  6. (Moderate) Move the collimator 5 mm hole in X, ±30 mm to calibrate the Active Collimator Y-response. Leave the collimator in the nominal position (0.5 mm hole at the nominal center) (Hall D)
  7. (Moderate) If the Active Collimator data provides a better position accuracy - move the beam in Y accordingly (Hall D/Accelerator)
  8. (High) Turn on the Start Counter (ST). Check the rate asymmetry (Hall D)
  9. (Moderate) Move the collimator ±10mm and check the rates on the ST (Hall D)
  10. (High) Set the solenoid current to 1000 A (Hall D)
  11. (High) Turn on the detectors one by one from the periphery to the center monitoring the rates without and with the beam (Hall D)
  12. (High) Control Access: install the cup target (2mm and 7mm thick) into the central position in Z (Hall D)
  13. (High) Re-establish beam (Accelerator)
  14. (High) Verify the standard BCAL vs FCAL trigger (timing and thresholds) - about 4h (Hall D)
  15. (High) Take 1 shift of data (Hall D)
  16. (Medium) Measure the rates and radiation levels with the 11·10-5 R.L. radiator

Back to main Fall14 commissioning page