Difference between revisions of "Primer for shift takers"

From Hall D Ops Wiki
Jump to: navigation, search
Line 237: Line 237:
 
[http://halldaxis7.jlab.org/ 31 - 32]
 
[http://halldaxis7.jlab.org/ 31 - 32]
 
</td>
 
</td>
<td bgcolor="#e0e0f0"> [[File:Alcoholbubbler.pngthumb|200px]] </td>
+
<td bgcolor="#e0e0f0"> [[File:Alcoholbubbler.png|thumb|200px]] </td>
 
<td bgcolor="#e0e0f0"> [https://halldweb.jlab.org/hdops/wiki/index.php/Gas_System_Shift Gas System Shift] </td>
 
<td bgcolor="#e0e0f0"> [https://halldweb.jlab.org/hdops/wiki/index.php/Gas_System_Shift Gas System Shift] </td>
 
</tr><tr>
 
</tr><tr>

Revision as of 11:53, 26 February 2016

Primer for Shift Takers

This document is an aid to fill the online version of the Check-list required in every shift at the Hall D Counting House. The entries can be found through different ways, one of those is presented here to provide an easy access to the information.
Additional information can be found under Shift Checklist.

How to use this guide

This guide follows the Shifters' Checklist structure and is separated in 5 columns:

  • Item: according to the Checklist.
  • Main Action Bar on EPICS: which indicates the Slow Control path to find the Item's current value.
  • Reference Number and Sample Figure: which show a general image of the screen and an specific one.
  • Information for Shift Takers: which shows the links to learn more about those systems.

Items of the Hall D Shift Check-list

Item Main Action Bar on EPICS
Subsystem - Component
Reference Number Sample Figure Information for Shift Takers
Beam Energy (GeV) BEAM - JTABs HallD O status.png
Beam Energy.png
Accelerator Screens
e- Beam Current (uA) BEAM - JTABs Accelerator-Status.png
E-Beam-Current.png
Accelerator Screens
Radiator (RL) BEAM - Motors EpicsNumbered.png #3
Amorphous Radiator.png
Amorphous Radiator
Tagger current (A)/field(T) MAGNET - Tagger EpicsNumbered.png #4
Tagger-Magnet.png
Tagging Spectrometer Shift
Solenoid current (A) MAGNETS - SOLENOID EpicsNumbered.png #5
Solenoid Screen Main.png
Solenoid Operations
Solenoid temperature ok?
Record He Return pressure

MAGNETS - SOLENOID

Cryo System
EpicsNumbered.png #6 - #7
Solenoid Screen Cryo.png
Solenoid Operations
Target type TARGET - CryoTarget Operations EpicsNumbered.png #8
CryoTarget Operations.png
Cryogenic Target Shift
Collimator aperture (mm) BEAM - Motors EpicsNumbered.png #9
Collimator.png
Collimator
All High Voltage ok? check box for, BCal, FCal, CDC, FDC, TOF, ST, PS, TagM, TagH Primer high voltages table 10 High Voltage
Trigger rate (kHz) Run Control rcGUI Rc.png
Trigger Rate.png
Data Acquisition
Trigger file/DAQ config. RCM Run Configuration Rcm
DAQ config detail.png
Data Acquisition
Pair Spec. current (A) MAGNETS - Pair Spectrometer EpicsNumbered.png #13
PS Magnet.png
Pair Spectrometer
Pair Spec. converter (RL) BEAM - Motors EpicsNumbered.png #14
PS Converter.png
PS Convert
Visual Halls Inspection GENERAL - Hall Cameras Hall D View from the east wall Cameras in the halls
DAQ screens up Type RCM at command line 16
Daq xterms.png
DAQ
EPICS summary screen up? GENERAL - GlueX Overview EpicsNumbered.png #17
EpicsNumbered.png
Slow Controls Shift
Alarm handlers up? Use gluon01 console machine From EPICS CSS Window->Open Perspective->Other->Alarm
AlarmPerspectiveCSS.jpg
Alarm Handler
Hall D electronic logbook up? Hall D logbook 19 Information for Shift Takers
MCC EPICS monitoring screen up? BEAM - jTABS
Wall Menu - Accelerator Status
20
Accel status.png
Accelerator Operations
Beam position on profilers OK? (upstrm/dwstrm) BEAM - Beam Profilers EpicsNumbered.png #21
Profiller epics screen.jpg
Beam Profilers
Beam position from Profilers
BPM AD00 (tagger dump) GENERAL - General GlueX Overview EpicsNumbered.png #22
Read dump bpm.jpg
BPM AD00
Quadrupole MQPAD00 on? GENERAL - General GlueX Overview EpicsNumbered.png #23
Quad current.png
Quad MQPAD00M
Event display ok? start_hdview2 24 Online_Monitoring Shift#Routine Operation
Online monitoring screens up start_monitoring 25 Online_Monitoring Shift#Routine Operation
Online monitoring histo ok? check box for BCal, FCal, CDC, FDC, TOF, ST, PS, TagM, TagH) 26 Online_Monitoring Shift#Routine Operation

Ar Gas supply Bank left(psi)


Ar Gas supply Bank right(psi)


CO2 Gas supply Bank left(psi)


CO2 Gas supply Bank right(psi)

CDC / FDC
Parking Lot Gas Bottles

27


28


29


30

Gas System Shift

Alcohol Bubbler top (bubbles/level?)


Alcohol Bubbler bottom (bubbles/level?)

GENERAL - Hall Cameras
Alcohol bubbler camera in the gas shed

31 - 32

Alcoholbubbler.png
Gas System Shift
Screen-shot of Epics Overview screen posted on HDlog? (PrtScr key) 33
EpicsNumbered.png
Screenshot
Check list printed and added to check-list binder? 34 (Binder inside Hall D Counting House)
Target Temp/Press (High/low cell T/In/out/vacuum P) TARGET - CryoTarget Operations 35
CryoTarget Operations.png
Cryogenic Target Shift


Primer high voltages table