Primer for shift takers

From Hall D Ops Wiki
Revision as of 11:29, 13 November 2018 by Elton (Talk | contribs) (Items of the Hall D Shift Check-list)

Jump to: navigation, search

Primer for Shift Takers

This document is an aid to fill the online version of the Check-list required in every shift at the Hall D Counting House. The entries can be found through different ways, one of those is presented here to provide an easy access to the information.
Additional information can be found under Shift Checklist.

How to use this guide

This guide follows the Shifters' Checklist structure and is separated in 5 columns:

  • Reference Number
  • Item: according to the Checklist.
  • Main Action Bar on EPICS: which indicates the Slow Control path to find the Item's current value.
  • Sample Figure: which show a general image of the screen and an specific one.
  • Information for Shift Takers: which shows the links to learn more about those systems.

Items of the Hall D Shift Check-list

/td>
Reference Number Item Main Action Bar on EPICS
Subsystem - Component
Sample Figure Information for Shift Takers
1. GlueX_Overview_annotated #1
HallD O status.png
Beam Energy (GeV) BEAM - JTABs
Beam Energy.png
Accelerator Screens
2. GlueX_Overview_annotated #2
Accelerator-Status.png
e- Beam Current (uA)
AD00C BCM
BEAM - JTABs
E-Beam-Current.png
Accelerator Screens
3. GlueX_Overview_annotated #3 Radiator (RL) BEAM - Motors
Amorphous Radiator.png
Amorphous Radiator
4. GlueX_Overview_annotated #4 Tagger current (A)/field(T) MAGNET - Tagger
Tagger-Magnet.png
Tagging Spectrometer Shift
5. GlueX_Overview_annotated #5 Solenoid current (A) MAGNETS - SOLENOID
Solenoid Screen Main.png
Solenoid Operations
6-7. SolenoidCryo_annotated2 #6-7

6a Temperature 'He Return'(K)
6b. Pressure 'Warm He Return' (Atm)
7. He Level 'DP LLH' (%)


Note: He level broken, use diff. press. gauge

MAGNETS - SOLENOID

Cryo System
SolenoidCryo annotated2.png
Solenoid Operations
8. GlueX_Overview_annotated #38 Target type TARGET - CryoTarget Operations
CryoTarget Operations.png
Cryogenic Target Shift
9. GlueX_Overview_annotated #9 Collimator aperture (mm) BEAM - Motors
Collimator.png
Collimator
10. All High Voltage ok? check box for, BCal, FCal, CDC, FDC, TOF, ST, PS, TagM, TagH Primer high voltages table
HVStatus.png
EPICS Main Menu / General / Status of Voltages
11. All Rates ok? check box for, BCal, FCal, PSC, PS, TAGH, TAGM, TOF EPICS Main Menu
Detector Subsystem Scalers
EPICS Main Menu /Detector Subsystem / Scalers
12. Rc_annotated2 #12 Live Time (%) Run Control rcGUI
DAQ LiveTime example.png
L1 Trigger Data Acquisition
13. Rc_annotated2 #13 Trigger rate (kHz) Run Control rcGUI
Trigger Rate.png
L1 Trigger Data Acquisition
14. Rcm Trigger file/DAQ config. RCM Run Configuration
DAQ config detail.png
L1 Trigger Data Acquisition
15. GlueX_Overview_annotated #15 Pair Spec. current (A) MAGNETS - Pair Spectrometer
PS Magnet.png
Pair Spectrometer
16. GlueX_Overview_annotated #16 Pair Spec. converter (RL) BEAM - Motors
PS Converter.png
PS Convert
17. Hall D View from the east wall

Hall D view from the west wall
Solenoid rack view from the north wall
TAC camera in Hall D Goniometer camera in tagger hall

Gas system camera on upstream platform
Visual Halls Inspection GENERAL - Hall Cameras Cameras in the halls
18. DAQ screens up? Type RCM at command line
Daq xterms.png
DAQ
19. GlueX_Overview_annotated #19 EPICS summary screen up? GENERAL - GlueX Overview
EpicsNumbered.png
Slow Controls Shift
20. From EPICS CSS Window->Open Perspective->Other->Alarm Alarm handlers up? Use gluon01 console machine
AlarmPerspectiveCSS.jpg
Alarm Handler
21. Hall D electronic logbook up? Hall D logbook Information for Shift Takers
22. MCC EPICS monitoring screen up? BEAM -> JMENU (opens JMenu window)
JMenu -> Wall Menu (opens new window)
Wall Menu Langeacc -> Accel Status (opens the screen you want)
Accel status.png
Accelerator Operations
23. GlueX_Overview_annotated #23 Beam position on (inner) Active Collimator ok? (upstrm/dwstrm) BEAM - Beam Profilers
Profiller epics screen.jpg
Beam Profilers
Beam position from Profilers
24. GlueX_Overview_annotated #24 BPM AD00 x,y position (tagger dump) GENERAL - General GlueX Overview
Read dump bpm.jpg
BPM AD00
25. GlueX_Overview_annotated #25 Quadrupole MQPAD00 current (A) GENERAL - General GlueX Overview
Quad current.png
Quad MQPAD00M
26. Event display ok? start_hdview2 or ~/HDvis/xstart_hdvis.sh Online_Monitoring Shift#Routine Operation
27. Online monitoring screens up? start_rootspy
20170126 rootspy.png
Online_Monitoring Shift#Routine Operation
28. Online monitoring histo ok? check box for BCal, FCal, CDC, FDC, TOF, ST, PS, TagM, TagH Online_Monitoring Shift#Routine Operation
29. Online monitoring plots in e-log? button on RootSpy GUI Online_Monitoring Shift#Routine Operation

30


31


32


33

CDC / FDC
Parking Lot Gas Bottles

Ar Gas supply Bank left(psi)


Ar Gas supply Bank right(psi)


CO2 Gas supply Bank left(psi)


CO2 Gas supply Bank right(psi)

GasPressures annotated.png
Gas System Shift
34 - 35.. Gas Shed Cam

Alcohol Bubbler top (bubbles/level?)


Alcohol Bubbler bottom (bubbles/level?)

GENERAL - Hall Cameras
Alcohol bubbler camera in the gas shed
Alcoholbubbler.png
Gas System Shift
36. Screen-shot of Epics Overview screen posted on HDlog? (PrtScr key)
EpicsNumbered.png
Screenshot
37. Check list printed and added to check-list binder? (Binder inside Hall D Counting House)
38. GlueX_Overview_annotated #38 Target Temp (Top/Bottom cell) TARGET - CryoTarget Operations
CryoTarget Operations.png
Cryogenic Target Shift
39. CryoTarget_Operations in/out/Vacuum Pressure Target Press (H2 supply/return, OVC) TARGET - CryoTarget Operations
CryoTarget Operations.png
Cryogenic Target Shift


Primer high voltages table