(Created page with "'''Meetings''' [https://bluejeans.com/520066503 07:45 M-F PD/RC] [https://bluejeans.com/569476853 08:00 M-F 13:30 Wed MCC] [https://bluejeans.com/660743227 08:45 M-F Hall D]...") |
|||
Line 12: | Line 12: | ||
* If someone does not show up, contact the PDL | * If someone does not show up, contact the PDL | ||
* Approval from Eugene is needed to change shift status (cancel/standby) | * Approval from Eugene is needed to change shift status (cancel/standby) | ||
− | |||
− | |||
− | |||
* Someone must be present if the target is full. | * Someone must be present if the target is full. | ||
− | * If the magnet is on, then someone should | + | * If the magnet is on, then someone should be in the counting house. If shifts are cancelled then the magnet can stay on if the hall in power permit or beam permit and the crew are instructed not to permit accesses without RC approval. Check with Eugene. |
Revision as of 09:11, 28 October 2021
Meetings
07:45 M-F PD/RC 08:00 M-F 13:30 Wed MCC 08:45 M-F Hall D
Shifts
- Email search page
- If someone does not show up, contact the PDL
- Approval from Eugene is needed to change shift status (cancel/standby)
- Someone must be present if the target is full.
- If the magnet is on, then someone should be in the counting house. If shifts are cancelled then the magnet can stay on if the hall in power permit or beam permit and the crew are instructed not to permit accesses without RC approval. Check with Eugene.
End of the week reports
- Keep track of BANU, will need to present it. Alexandre keeps track of the total % of time used and data collected.
- [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed
- Not sure what this BTA link is (has to be on a wired computer)
- RC summary to be sent to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too)