Difference between revisions of "RC Helpsheet"

From Hall D Ops Wiki
Jump to: navigation, search
Line 16: Line 16:
 
'''End of the week reports'''
 
'''End of the week reports'''
 
* Keep track of BANU time, will need to present it.  Alexandre keeps track of the total % of time used and data collected.   
 
* Keep track of BANU time, will need to present it.  Alexandre keeps track of the total % of time used and data collected.   
* [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed
+
* [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed]
 
* [https://accweb.acc.jlab.org/btm/reports/beam-time-summary Not sure what this BTA link is (has to be on a wired computer)]
 
* [https://accweb.acc.jlab.org/btm/reports/beam-time-summary Not sure what this BTA link is (has to be on a wired computer)]
 
* [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too)
 
* [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too)

Revision as of 09:12, 28 October 2021

Meetings


Shifts

  • Email search page
  • If someone does not show up, contact the PDL
  • Approval from Eugene is needed to change shift status (cancel/standby)
  • Someone must be present if the target is full.
  • If the magnet is on, then someone should be in the counting house. If shifts are cancelled then the magnet can stay on if the hall in power permit or beam permit and the crew are instructed not to permit accesses without RC approval. Check with Eugene.


End of the week reports