Difference between revisions of "RC Helpsheet"

From Hall D Ops Wiki
Jump to: navigation, search
Line 18: Line 18:
 
* [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed]
 
* [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed]
 
* [https://accweb.acc.jlab.org/btm/reports/beam-time-summary Accelerator beam time summary for the week (pie chart)]
 
* [https://accweb.acc.jlab.org/btm/reports/beam-time-summary Accelerator beam time summary for the week (pie chart)]
* [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent in an email to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too)  Alexandre adds them to the wiki page.
+
* [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent in an email to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too). Alexandre adds them to the wiki page.
 
* [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&title=&fullscreen=false&layoutMode=1&viewerMode=2&pv=IBCAD00CRCUR6&pv=HD%3Acoda%3Adaq%3Astatus&RESET%3Ai%3AGasPanelBarPress1yAxisLabel=&RESET%3Ai%3AGasPanelBarPress1yAxisMin=&RESET%3Ai%3AGasPanelBarPress1yAxisMax=&RESET%3Ai%3AGasPanelBarPress1scaler=&RESET%3Ai%3AGasPanelBarPress1yAxisLog=&windowMinutes=1440&start=2022-10-26+16%3A23%3A49&end=2022-10-26+16%3A28%3A49&IBCAD00CRCUR6label=IBCAD00CRCUR6&IBCAD00CRCUR6color=%23a6cee3&IBCAD00CRCUR6yAxisLabel=&IBCAD00CRCUR6yAxisMin=&IBCAD00CRCUR6yAxisMax=&IBCAD00CRCUR6yAxisLog=&IBCAD00CRCUR6scaler=&HD%3Acoda%3Adaq%3Astatuslabel=HD%3Acoda%3Adaq%3Astatus&HD%3Acoda%3Adaq%3Astatuscolor=%231f78b4&HD%3Acoda%3Adaq%3AstatusyAxisLabel=&HD%3Acoda%3Adaq%3AstatusyAxisMin=&HD%3Acoda%3Adaq%3AstatusyAxisMax=&HD%3Acoda%3Adaq%3AstatusyAxisLog=&HD%3Acoda%3Adaq%3Astatusscaler= WAVE gui] plot showing DAQ status and beam current for the last 24h
 
* [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&title=&fullscreen=false&layoutMode=1&viewerMode=2&pv=IBCAD00CRCUR6&pv=HD%3Acoda%3Adaq%3Astatus&RESET%3Ai%3AGasPanelBarPress1yAxisLabel=&RESET%3Ai%3AGasPanelBarPress1yAxisMin=&RESET%3Ai%3AGasPanelBarPress1yAxisMax=&RESET%3Ai%3AGasPanelBarPress1scaler=&RESET%3Ai%3AGasPanelBarPress1yAxisLog=&windowMinutes=1440&start=2022-10-26+16%3A23%3A49&end=2022-10-26+16%3A28%3A49&IBCAD00CRCUR6label=IBCAD00CRCUR6&IBCAD00CRCUR6color=%23a6cee3&IBCAD00CRCUR6yAxisLabel=&IBCAD00CRCUR6yAxisMin=&IBCAD00CRCUR6yAxisMax=&IBCAD00CRCUR6yAxisLog=&IBCAD00CRCUR6scaler=&HD%3Acoda%3Adaq%3Astatuslabel=HD%3Acoda%3Adaq%3Astatus&HD%3Acoda%3Adaq%3Astatuscolor=%231f78b4&HD%3Acoda%3Adaq%3AstatusyAxisLabel=&HD%3Acoda%3Adaq%3AstatusyAxisMin=&HD%3Acoda%3Adaq%3AstatusyAxisMax=&HD%3Acoda%3Adaq%3AstatusyAxisLog=&HD%3Acoda%3Adaq%3Astatusscaler= WAVE gui] plot showing DAQ status and beam current for the last 24h
  

Revision as of 18:47, 12 December 2022

Meetings

Shifts

  • Hall D shift email list JLab email search page
  • If someone does not show up, contact the PDL. Required training Training status
  • Approval from Eugene is needed to change shift status (cancel/standby)
  • Someone must be present if the cryogenic target is full. We warn the target experts (Chris Keith & Chris Carlin) - usually with a text message - before emptying or filling it.
  • If the magnet is on, then someone should be in the counting house. If shifts are cancelled then the magnet can stay on if the hall in power permit or beam permit and the crew are instructed not to permit accesses without RC approval. Check with Eugene.


End of the week reports


MCC busy times

  • Accelerator shift changes are nominally 7:30-8:30 am, 3:30-4:30pm, and 11:30pm-12:30am.
  • Please strictly avoid 8:00-8:15am, 4:00-4:15pm, and 12:00-12:15am when making non-emergency requests for beam delivery modifications. (from page 8 of this)


The phone

  • It can be forwarded to your cellphone.