Difference between revisions of "RC Helpsheet"

From Hall D Ops Wiki
Jump to: navigation, search
 
(28 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
'''Meetings'''
 
'''Meetings'''
  
* [https://bluejeans.com/520066503 07:45 M-F PD/RC]
+
* 07:45 M-F PD/RC [https://jlab-org.zoomgov.com/j/1611456010?pwd=d2RJWTJQRDM0ZkNaZ1dpTmtLWDAwQT09 zoom]
* [https://bluejeans.com/569476853 08:00 M-F 13:30 Wed MCC]. Starting 12/16/2021, use zoom ([https://jlab-org.zoomgov.com/j/1601304841?pwd=Z1RIOVVUdkdXL2R2LzREZUNOUlh1dz09 link here]) rather than Bluejeans.
+
* 08:00 M-F & 13:30 Wed MCC [https://jlab-org.zoomgov.com/j/1601304841?pwd=Z1RIOVVUdkdXL2R2LzREZUNOUlh1dz09 zoom]
* [https://bluejeans.com/660743227 08:45 M-F Hall D]   [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings Hall D wiki meeting page]
+
* 08:45 M-F Hall D    [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 zoom] [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Summer2022 Hall D wiki page]
 +
* [https://logbooks.jlab.org/entry/3964820 Logbook post with full connection details for MCC meetings]
  
  
 
'''Shifts'''
 
'''Shifts'''
* [https://misportal.jlab.org/staff_search Email search page]
+
* [https://www.jlab.org/Hall-D/shifts/index.php?doc=email_list Hall D shift email list] [https://misportal.jlab.org/staff_search JLab email search page]
* If someone does not show up, contact the PDL
+
* If someone does not show up, contact the PDL. [https://www.jlab.org/Hall-D/hd_safety.php Required training]  [https://misportal.jlab.org/training/people/skills Training status]
 
* Approval from Eugene is needed to change shift status (cancel/standby)
 
* Approval from Eugene is needed to change shift status (cancel/standby)
* Someone must be present if the target is full.  
+
* Someone must be present if the cryogenic target is full. We warn the target experts (Chris Keith & Chris Carlin) - usually with a text message - before emptying or filling it. 
 
* If the magnet is on, then someone should be in the counting house. If shifts are cancelled then the magnet can stay on if the hall in power permit or beam permit and the crew are instructed not to permit accesses without RC approval. Check with Eugene.  
 
* If the magnet is on, then someone should be in the counting house. If shifts are cancelled then the magnet can stay on if the hall in power permit or beam permit and the crew are instructed not to permit accesses without RC approval. Check with Eugene.  
 +
 +
 +
'''Harp scan extrapolation plots'''
 +
* The beam convergence is good enough if all 3 lines & shaded areas pass beneath the arrow at (195m, 0.5mm).
  
  
 
'''End of the week reports'''
 
'''End of the week reports'''
* Keep track of BANU time, will need to present it.  Alexandre keeps track of the total % of time used and data collected.   
+
* Keep track of BANU time, will need to present it.  Alexandre keeps track of the total % of time used and data collected. He will send on Wednesday morning the numbers used to fill the form below.   
 
* [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed]
 
* [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed]
 
* [https://accweb.acc.jlab.org/btm/reports/beam-time-summary Accelerator beam time summary for the week (pie chart)]
 
* [https://accweb.acc.jlab.org/btm/reports/beam-time-summary Accelerator beam time summary for the week (pie chart)]
* [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too)
+
* [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent in an email to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too).  Alexandre adds them to the wiki page.
 +
* [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&title=&fullscreen=false&layoutMode=1&viewerMode=2&pv=IBCAD00CRCUR6&pv=HD%3Acoda%3Adaq%3Astatus&RESET%3Ai%3AGasPanelBarPress1yAxisLabel=&RESET%3Ai%3AGasPanelBarPress1yAxisMin=&RESET%3Ai%3AGasPanelBarPress1yAxisMax=&RESET%3Ai%3AGasPanelBarPress1scaler=&RESET%3Ai%3AGasPanelBarPress1yAxisLog=&windowMinutes=1440&start=2022-10-26+16%3A23%3A49&end=2022-10-26+16%3A28%3A49&IBCAD00CRCUR6label=IBCAD00CRCUR6&IBCAD00CRCUR6color=%23a6cee3&IBCAD00CRCUR6yAxisLabel=&IBCAD00CRCUR6yAxisMin=&IBCAD00CRCUR6yAxisMax=&IBCAD00CRCUR6yAxisLog=&IBCAD00CRCUR6scaler=&HD%3Acoda%3Adaq%3Astatuslabel=HD%3Acoda%3Adaq%3Astatus&HD%3Acoda%3Adaq%3Astatuscolor=%231f78b4&HD%3Acoda%3Adaq%3AstatusyAxisLabel=&HD%3Acoda%3Adaq%3AstatusyAxisMin=&HD%3Acoda%3Adaq%3AstatusyAxisMax=&HD%3Acoda%3Adaq%3AstatusyAxisLog=&HD%3Acoda%3Adaq%3Astatusscaler= WAVE gui] plot showing DAQ status and beam current for the last 24h
 +
 
 +
 
 +
'''MCC busy times'''
 +
* Accelerator shift changes are nominally 7:30-8:30 am, 3:30-4:30pm, and 11:30pm-12:30am.
 +
* Please strictly avoid 8:00-8:15am, 4:00-4:15pm, and 12:00-12:15am when making non-emergency requests for beam delivery modifications. ([https://www.jlab.org/sites/default/files/user-liaison/documents/Web20211122.1.pdf from page 8 of this])
 +
 
 +
 
 +
'''Escorted accesses'''
 +
* The most efficient way to set these up is to arrange to meet Radcon at an agreed time, and call MCC 15 minutes before that time to request power permit. Radcon people are usually available from 8am to 4-6pm.
 +
 
 +
 
 +
'''The phone'''
 +
* It can be forwarded to your cellphone but there are big advantages to calling people from the RC phone, they recognise the caller ID.

Latest revision as of 09:09, 15 March 2023

Meetings


Shifts

  • Hall D shift email list JLab email search page
  • If someone does not show up, contact the PDL. Required training Training status
  • Approval from Eugene is needed to change shift status (cancel/standby)
  • Someone must be present if the cryogenic target is full. We warn the target experts (Chris Keith & Chris Carlin) - usually with a text message - before emptying or filling it.
  • If the magnet is on, then someone should be in the counting house. If shifts are cancelled then the magnet can stay on if the hall in power permit or beam permit and the crew are instructed not to permit accesses without RC approval. Check with Eugene.


Harp scan extrapolation plots

  • The beam convergence is good enough if all 3 lines & shaded areas pass beneath the arrow at (195m, 0.5mm).


End of the week reports

  • Keep track of BANU time, will need to present it. Alexandre keeps track of the total % of time used and data collected. He will send on Wednesday morning the numbers used to fill the form below.
  • Summary for MCC 13:30 Wed
  • Accelerator beam time summary for the week (pie chart)
  • RC summary to be sent in an email to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too). Alexandre adds them to the wiki page.
  • WAVE gui plot showing DAQ status and beam current for the last 24h


MCC busy times

  • Accelerator shift changes are nominally 7:30-8:30 am, 3:30-4:30pm, and 11:30pm-12:30am.
  • Please strictly avoid 8:00-8:15am, 4:00-4:15pm, and 12:00-12:15am when making non-emergency requests for beam delivery modifications. (from page 8 of this)


Escorted accesses

  • The most efficient way to set these up is to arrange to meet Radcon at an agreed time, and call MCC 15 minutes before that time to request power permit. Radcon people are usually available from 8am to 4-6pm.


The phone

  • It can be forwarded to your cellphone but there are big advantages to calling people from the RC phone, they recognise the caller ID.