Difference between revisions of "RC report Fall2021 w9"

From Hall D Ops Wiki
Jump to: navigation, search
(Created page with "test")
 
Line 1: Line 1:
test
+
The production rate during this week was reduced as a result of several events, never-the-less we had >50% up time. On our side, the FDC chiller tripped due to overheating as a result of blocked chilled-water supply. The supply was restored by cleaning the needle valve and replacing the filter but the chiller was not functional. Later att

Revision as of 11:44, 22 October 2021

The production rate during this week was reduced as a result of several events, never-the-less we had >50% up time. On our side, the FDC chiller tripped due to overheating as a result of blocked chilled-water supply. The supply was restored by cleaning the needle valve and replacing the filter but the chiller was not functional. Later att