RC report Fall2021 w9

From Hall D Ops Wiki
Revision as of 11:44, 22 October 2021 by Pentchev (Talk | contribs)

Jump to: navigation, search

The production rate during this week was reduced as a result of several events, never-the-less we had >50% up time. On our side, the FDC chiller tripped due to overheating as a result of blocked chilled-water supply. The supply was restored by cleaning the needle valve and replacing the filter but the chiller was not functional. Later att