Difference between revisions of "Run Planing Meeting 2018-08-02"

From Hall D Ops Wiki
Jump to: navigation, search
(Agenda)
Line 20: Line 20:
 
*Preparations  [https://accweb.acc.jlab.org/hco/readiness?regionId=&groupId=&qualified=  System Readiness]
 
*Preparations  [https://accweb.acc.jlab.org/hco/readiness?regionId=&groupId=&qualified=  System Readiness]
 
*#Documentation and Schedule
 
*#Documentation and Schedule
*## Part1: Aug. 23rd to Oct. 28th, E12-06-102
+
*## Part1: Aug. 23rd to Oct. 28th, E12-06-102! (2.1 GeV/pass)
 
*## Part2: Nov. 19th to Dec. 19th, low energy! (1.86 GeV/pass, 1.61 GeV/pass)
 
*## Part2: Nov. 19th to Dec. 19th, low energy! (1.86 GeV/pass, 1.61 GeV/pass)
 
*## Run Number Range 50000- with "RunPeriod-2018-08"
 
*## Run Number Range 50000- with "RunPeriod-2018-08"

Revision as of 10:51, 30 July 2018

Connect Information

To connect from the outside by phone please do the following

  1. To join via a Web Browser, https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
  4. The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Specific instructions for connecting from JLab's Hall D conference room:

Turn polycon on if necessary (do it before turning the computer on) With the polycon, place a call at 199.48.152.152 Press # to enable the polycom keypad, then enter the meeting id: 660743227 and # You may have to unmute the microphone: #*4 Turn the computer on if needed

Agenda

  • Preparations System Readiness
    1. Documentation and Schedule
      1. Part1: Aug. 23rd to Oct. 28th, E12-06-102! (2.1 GeV/pass)
      2. Part2: Nov. 19th to Dec. 19th, low energy! (1.86 GeV/pass, 1.61 GeV/pass)
      3. Run Number Range 50000- with "RunPeriod-2018-08"
    2. Beam-line (Radiators, ....)
    3. Magnets (Tagger, Solenoid, .....)
    4. Detectors (Standard, new, ...)