(Created page with "Run info logging Keep a list of the runs at the end of the shift summary log entry, eg https://logbooks.jlab.org/entry/3795057 Keep the runs to 2h real-time at most....") |
|||
Line 1: | Line 1: | ||
− | Run info logging | + | === Run info logging === |
− | + | # Keep a list of the runs at the end of the shift summary log entry, eg https://logbooks.jlab.org/entry/3795057 | |
− | + | # Keep the runs to 2h real-time at most. Calibrations drifts are noticeable after about 2h. | |
− | + | # Write run info into the DAQ run comments box at the start of the run and save it. | |
− | + | # Make sure that the paper list of runs is kept up to date. | |
+ | === Monitoring === | ||
− | + | # Half-way through each run, post the rootspy monitoring histograms to the logbook and reset them. Post the new plots at the end of the run. | |
+ | # Make a screenshot of the GlueX overview CSS logentry mid-shift. | ||
+ | # Remind the shift worker to complete the shift checklist. | ||
+ | # Watch the beam monitoring stripcharts, currently using beam_instability_monitoring configuration, & post to the logbook at the end of the shift | ||
+ | # New, maybe temporary: if PS coincidence rates drop by 30% or more, do harp scans (MCC & ours) | ||
− | + | === Changing radiators === | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
+ | # Each time the amorphous radiator is inserted, make a new AMO reference with beam on. | ||
+ | # Each time the diamond radiator is inserted or its orientation changed, use the nudge buttons to obtain the desired coherent edge fit value, save the new configurations as instructed in | ||
+ | # [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Adjusting_the_peak_positions and make a screenshot logentry of the cobrems gui] | ||
− | + | === Alarms === | |
− | + | # When acknowledging alarms for mechanical and DIRC, acknowledge them at the lowest level of the tree. This is to avoid sending 'OK' messages to the on-call phones for all the branches of the tree which were not alarming. | |
− | + | # Make separate logbook entries for worrying alarms & contact experts as needed. | |
+ | === BTA guidelines === | ||
− | + | # [https://halldweb.jlab.org/wiki/index.php/BTA_guidelines BTA Guidelines] | |
− | + | === Access === | |
− | + | ||
− | + | # We keep a list of requests for opportunistic access on the whiteboard. We also have to keep a list of who is actually in the hall during accesses. | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + |
Revision as of 13:33, 9 March 2020
Run info logging
- Keep a list of the runs at the end of the shift summary log entry, eg https://logbooks.jlab.org/entry/3795057
- Keep the runs to 2h real-time at most. Calibrations drifts are noticeable after about 2h.
- Write run info into the DAQ run comments box at the start of the run and save it.
- Make sure that the paper list of runs is kept up to date.
Monitoring
- Half-way through each run, post the rootspy monitoring histograms to the logbook and reset them. Post the new plots at the end of the run.
- Make a screenshot of the GlueX overview CSS logentry mid-shift.
- Remind the shift worker to complete the shift checklist.
- Watch the beam monitoring stripcharts, currently using beam_instability_monitoring configuration, & post to the logbook at the end of the shift
- New, maybe temporary: if PS coincidence rates drop by 30% or more, do harp scans (MCC & ours)
Changing radiators
- Each time the amorphous radiator is inserted, make a new AMO reference with beam on.
- Each time the diamond radiator is inserted or its orientation changed, use the nudge buttons to obtain the desired coherent edge fit value, save the new configurations as instructed in
- and make a screenshot logentry of the cobrems gui
Alarms
- When acknowledging alarms for mechanical and DIRC, acknowledge them at the lowest level of the tree. This is to avoid sending 'OK' messages to the on-call phones for all the branches of the tree which were not alarming.
- Make separate logbook entries for worrying alarms & contact experts as needed.
BTA guidelines
Access
- We keep a list of requests for opportunistic access on the whiteboard. We also have to keep a list of who is actually in the hall during accesses.