Difference between revisions of "Shift check-list"
From Hall D Ops Wiki
Line 43: | Line 43: | ||
|- | |- | ||
| Beam position on tagger dump viewer || || || | | | Beam position on tagger dump viewer || || || | | ||
− | |||
− | |||
|- | |- | ||
| quadrupole MQPAD00 on? || || || | | | quadrupole MQPAD00 on? || || || | | ||
|} | |} |
Revision as of 11:10, 22 September 2014
Date: (mm/dd) | |||
---|---|---|---|
Time (hh/mm, 24:00) | |||
Your Initials | |||
Beam Energy (GeV) | |||
e- Beam Current (uA) | |||
Radiator (RL) | |||
Tagger current (A)/field(T) | |||
Solenoid current (A) | |||
Target type | |||
Collimator type | |||
Pair Spec. current (A) | |||
Pair Spec. converter (RL) | |||
Visual Halls Inspection | |||
DAQ screens up | |||
Online monitoring screens up | |||
Slow control screens up | |||
Alarm handlers up | |||
Hall D electronic logbook up | |||
MCC Epics monitoring screen up | |||
Beam position on profilers (upstrm/dwstrm) | |||
Beam position on tagger dump viewer | |||
quadrupole MQPAD00 on? |