Difference between revisions of "Shift check-list"

From Hall D Ops Wiki
Jump to: navigation, search
Line 43: Line 43:
 
|-
 
|-
 
|  Beam position on tagger dump viewer  ||    ||    ||      |   
 
|  Beam position on tagger dump viewer  ||    ||    ||      |   
|-
 
|    ||    ||    ||      |
 
 
|-
 
|-
 
|  quadrupole MQPAD00 on?  ||    ||    ||      |  
 
|  quadrupole MQPAD00 on?  ||    ||    ||      |  
 
  |}
 
  |}

Revision as of 11:10, 22 September 2014

Shift check-list
Date: (mm/dd)
Time (hh/mm, 24:00)
Your Initials
Beam Energy (GeV)
e- Beam Current (uA)
Radiator (RL)
Tagger current (A)/field(T)
Solenoid current (A)
Target type
Collimator type
Pair Spec. current (A)
Pair Spec. converter (RL)
Visual Halls Inspection
DAQ screens up
Online monitoring screens up
Slow control screens up
Alarm handlers up
Hall D electronic logbook up
MCC Epics monitoring screen up
Beam position on profilers (upstrm/dwstrm)
Beam position on tagger dump viewer
quadrupole MQPAD00 on?