Difference between revisions of "Shift check-list"

From Hall D Ops Wiki
Jump to: navigation, search
Line 19: Line 19:
 
|-
 
|-
 
|  Solenoid temperature alarms ok?  ||    ||    ||      |  
 
|  Solenoid temperature alarms ok?  ||    ||    ||      |  
 +
|  Record He pressure  ||    ||    ||      |
 
|-
 
|-
 
|  Target type  ||    ||    ||      |  
 
|  Target type  ||    ||    ||      |  

Revision as of 15:56, 16 October 2014

Shift check-list
Date: (mm/dd)
Time (hh/mm, 24:00)
Your Initials
Beam Energy (GeV)
e- Beam Current (uA)
Radiator (RL)
Tagger current (A)/field(T)
Solenoid current (A)
Solenoid temperature alarms ok? Record He pressure
Target type
Collimator type
Trigger rate (kHz)
Pair Spec. current (A)
Pair Spec. converter (RL)
Visual Halls Inspection
DAQ screens up
Online monitoring screens up
Slow control screens up
Alarm handlers up
Hall D electronic logbook up
MCC Epics monitoring screen up
Beam position on profilers OK? (upstrm/dwstrm)
Beam position on tagger dump viewer
Quadrupole MQPAD00 on?
Event display ok?
Online monitoring histo ok?