Difference between revisions of "Shift check-list"

From Hall D Ops Wiki
Jump to: navigation, search
Line 22: Line 22:
 
|  Target type  ||    ||    ||      |  
 
|  Target type  ||    ||    ||      |  
 
|-
 
|-
|  Collimator type ||    ||    ||      |   
+
|  Collimator aperture (mm) ||    ||    ||      |   
 
|-
 
|-
 
|  Trigger rate (kHz)  ||    ||    ||      |   
 
|  Trigger rate (kHz)  ||    ||    ||      |   
 +
|-
 +
|  Trigger file/DAQ config.  ||    ||    ||      | 
 
|-
 
|-
 
|  Pair Spec. current (A)  ||    ||    ||      |  
 
|  Pair Spec. current (A)  ||    ||    ||      |  
Line 34: Line 36:
 
|  DAQ screens up  ||    ||    ||      |  
 
|  DAQ screens up  ||    ||    ||      |  
 
|-
 
|-
Online monitoring screens up ||    ||    ||      |
+
Epic summary screen up? ||    ||    ||      |  
|-
+
|  Slow control screens up  ||    ||    ||      |  
+
 
|-
 
|-
 
|  Alarm handlers up  ||    ||    ||      |  
 
|  Alarm handlers up  ||    ||    ||      |  
Line 51: Line 51:
 
|-
 
|-
 
|  Event display ok?  ||    ||    ||      |  
 
|  Event display ok?  ||    ||    ||      |  
 +
|-
 +
|  Online monitoring screens up ||    ||    ||      |
 
|-
 
|-
 
|  Online monitoring histo ok?  ||    ||    ||      |  
 
|  Online monitoring histo ok?  ||    ||    ||      |  
 
  |}
 
  |}

Revision as of 16:02, 16 October 2014

Shift check-list
Date: (mm/dd)
Time (hh/mm, 24:00)
Your Initials
Beam Energy (GeV)
e- Beam Current (uA)
Radiator (RL)
Tagger current (A)/field(T)
Solenoid current (A)
Solenoid temperature alarms ok? Record He pressure
Target type
Collimator aperture (mm)
Trigger rate (kHz)
Trigger file/DAQ config.
Pair Spec. current (A)
Pair Spec. converter (RL)
Visual Halls Inspection
DAQ screens up
Epic summary screen up?
Alarm handlers up
Hall D electronic logbook up
MCC Epics monitoring screen up
Beam position on profilers OK? (upstrm/dwstrm)
Beam position on tagger dump viewer
Quadrupole MQPAD00 on?
Event display ok?
Online monitoring screens up
Online monitoring histo ok?