Difference between revisions of "Shift check-list"
From Hall D Ops Wiki
Line 28: | Line 28: | ||
| Pair Spec. converter (RL) || || || | | | Pair Spec. converter (RL) || || || | | ||
|- | |- | ||
− | | | + | | Visual Halls Inspection || || || | |
|- | |- | ||
| DAQ screens up || || || | | | DAQ screens up || || || | |
Revision as of 18:15, 22 September 2014
Date: (mm/dd) | |||
---|---|---|---|
Time (hh/mm, 24:00) | |||
Your Initials | |||
Beam Energy (GeV) | |||
e- Beam Current (uA) | |||
Radiator (RL) | |||
Tagger current (A)/field(T) | |||
Solenoid current (A) | |||
Target type | |||
Collimator type | |||
Trigger rate (kHz) | |||
Pair Spec. current (A) | |||
Pair Spec. converter (RL) | |||
Visual Halls Inspection | |||
DAQ screens up | |||
Online monitoring screens up | |||
Slow control screens up | |||
Alarm handlers up | |||
Hall D electronic logbook up | |||
MCC Epics monitoring screen up | |||
Beam position on profilers OK? (upstrm/dwstrm) | |||
Beam position on tagger dump viewer | |||
Quadrupole MQPAD00 on? | |||
Event display ok? | |||
Online monitoring histo ok? |