Shift check-list

From Hall D Ops Wiki
Revision as of 11:19, 22 September 2014 by Deurpam (Talk | contribs)

Jump to: navigation, search
Shift check-list
Date: (mm/dd)
Time (hh/mm, 24:00)
Your Initials
Beam Energy (GeV)
e- Beam Current (uA)
Radiator (RL)
Tagger current (A)/field(T)
Solenoid current (A)
Target type
Collimator type
Trigger rate (kHz)
Pair Spec. current (A)
Pair Spec. converter (RL)
Visual Halls Inspection
DAQ screens up
Online monitoring screens up
Slow control screens up
Alarm handlers up
Hall D electronic logbook up
MCC Epics monitoring screen up
Beam position on profilers OK? (upstrm/dwstrm)
Beam position on tagger dump viewer
Quadrupole MQPAD00 on?
Event display ok?
Online monitoring histo ok?