Shift check-list

From Hall D Ops Wiki
Revision as of 16:09, 16 October 2014 by Deurpam (Talk | contribs)

Jump to: navigation, search
Shift check-list
Date: (mm/dd)
Time (hh/mm, 24:00)
Your Initials
Beam Energy (GeV)
e- Beam Current (uA)
Radiator (RL)
Tagger current (A)/field(T)
Solenoid current (A)
Solenoid temperature alarms ok? Record He pressure
Target type
Collimator aperture (mm)
All High Voltage ok? check box for BCal, FCal, CDC, FDC, TOF, ST, PS, TagM, TagH) \Box \Box \Box \Box \Box \Box \Box \Box \Box \Box \Box \Box \Box \Box \Box \Box \Box \Box
Trigger rate (kHz)
Trigger file/DAQ config.
Pair Spec. current (A)
Pair Spec. converter (RL)
Visual Halls Inspection
DAQ screens up
Epic summary screen up?
Alarm handlers up
Hall D electronic logbook up
MCC Epics monitoring screen up
Beam position on profilers OK? (upstrm/dwstrm)
Beam position on tagger dump viewer
Quadrupole MQPAD00 on?
Event display ok?
Online monitoring screens up
Online monitoring histo ok?
Ar Gas supply Bank left(psi)
Ar Gas supply Bank right(psi)
CO2 Gas supply Bank left(psi)
CO2 Gas supply Bank right(psi)
Alcohol Bubbler top (bubbles?)
Alcohol Bubbler bottom (bubbles?)