(Special instructions)
(CDC Weather alarm)
Line 49: Line 49:
 
=== CDC Weather alarm ===
 
=== CDC Weather alarm ===
  
'''Alternative barometric pressure measurement''' in EPICS & how to use it: https://logbooks.jlab.org/entry/4117271
+
aka Alarm on HD:coda:cdc:p_diff.
 
+
The measurement can be seen with LivePlot,  B_SYS_WEATHER_SF_L3_Press .
+
 
+
'''A pressure difference of 0.4''' in B_SYS_WEATHER_SF_L3_Press would be equivalent to a pressure difference of 0.1 kPa in Hall D's PV RESET:i:GasPanelBarPress1. That's the criterion for '''starting a new run.'''
+
 
+
( aka Alarm on HD:coda:cdc:p_diff.
+
 
See https://logbooks.jlab.org/entry/4001862
 
See https://logbooks.jlab.org/entry/4001862
 
* Stop run - Acknowledge alarm and document it - Start new run  
 
* Stop run - Acknowledge alarm and document it - Start new run  
 
The alarm has been disabled, see logbook entries [https://logbooks.jlab.org/entry/4114344 4114344], [https://logbooks.jlab.org/entry/4114307 4114307]
 
The alarm has been disabled, see logbook entries [https://logbooks.jlab.org/entry/4114344 4114344], [https://logbooks.jlab.org/entry/4114307 4114307]
)
 
  
 
=== After beam restoration ===
 
=== After beam restoration ===

Revision as of 11:58, 26 January 2023

Do reload this page, it gets updated frequently.

Current Experiment

Rare Eta Decay & GlueX II (with DIRC)

  • Experiment number: E12-12-002 (use in BTA shift information)
  • Proposal
  • Spokesperson: C. A. Meyer

Notes

  • All GlueX detectors (including DIRC)

Run conditions

Hall D counting room whiteboard

  • Radiator: JD70-103 50 um diamond (4 orientations: 0, 90, 45, -45)
  • Collimator: 5.0 mm
  • TPOL converter: Be 75 um
  • Runs are no more than 2 hours - see whiteboard for the production cycle
  • Target: Liquid Hydrogen

DAQ configuration

  • Setup: FCAL_BCAL_PS_m9
  • Production: PHYSICS_DIRC
  • (Raw mode: PHYSICS_DIRC_RAW)

Run plan

See the daily plan in Run Coordination Meetings:Spring2023 and also the counting house whiteboard

Shift duties

Shift Leader

Shift Worker

Special instructions

Hall Delta

It's good practice to refer to our hall as Delta when talking to MCC, to make sure that there is no acoustic confusion between us and Hall B.

Screenshot tool

"Alt L" brings up the screenshot tool for making E-log entries

FCAL Base lockup

If FCAL HV bases lose communication and stop providing high voltage, refer to https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Calorimeter_Shift#FCAL_Base_lockup

CDC Weather alarm

aka Alarm on HD:coda:cdc:p_diff. See https://logbooks.jlab.org/entry/4001862

  • Stop run - Acknowledge alarm and document it - Start new run

The alarm has been disabled, see logbook entries 4114344, 4114307

After beam restoration

  • check the radiation levels without radiator and then with the radiator
    • see the whiteboard (bottom RHS corner of the RH board) - there are columns of values expected without and with the radiator
  • retract the radiator
  • collimator in blocking position
  • ask MCC to do their harp scan
  • our harp scans: follow the instructions in Beam_Line_Detectors_Shift#Radiator_Harp_Scan

rootspy

If you have to restart rootspy, Online_Monitoring_Shift#Routine_Operation, and it crashes, you might have to restart the monitoring process, find help at Online_Monitoring_Shift#Starting_and_stopping_the_Monitoring_System.

DAQ issues

Call the expert. In case they suggest that you restart the DAQ, find information at Data_Acquisition_Shift.

BTA sheet

  • The BTA guidelines are at BTA_guidelines.
    After loading the EPICS values, you may change the values, eg round them up or down.
    • BANU values should be reflected in the PCC (or UED) value (else the aftermath doesnt work out for RC), put a comment for > 5minutes.
    • UED: unplanned experiment down (hardware failure).