== Old Wiki Page == | == Old Wiki Page == | ||
− | [https://halldweb1.jlab.org/wiki/index.php/Superconducting_Solenoid] | + | [https://halldweb1.jlab.org/wiki/index.php/Superconducting_Solenoid https://halldweb1.jlab.org/wiki/index.php/Superconducting_Solenoid] |
== Procedure == | == Procedure == |
Revision as of 11:43, 30 September 2014
Contents
Old Wiki Page
https://halldweb1.jlab.org/wiki/index.php/Superconducting_Solenoid
Procedure
Operational Safety Procedure (OSP)
- Hall D Solenoid Magnet - Cryogenic Operations
- ENG-12-19709-OSP
- Hall D Solenoid Power Supply Test and Maintenance
- -13-21781-OSP
- Hall D Solenoid Powered Operations OSP
- FEL-13-22021-OSP
Procedure and Checklist
- Solenoid Cooldown Checklists
- D000000402-P003 Rev A
- Solenoid Vacuum System Controls Check Procedure
- D000000402P004
- Hall D Solenoid System Hi-Pot Procedure
- D000000402P006 RevA
- Solenoid Voltage Tap Check List
- D000000402-P010
- Hall D Solenoid Pre Power-Up Checklists
- D000000402P007
- Hall D Solenoid Magnet Power Supply Maintenance Turn-on Checklist
- D000001611P000 Rev A
- Hall D Solenoid Magnet Power Supply Internal Interlock Checklist
- D000001611P001 Rev B
- Ground Fault Detector Rheostat Setting Procedure
- D000000402P011
- Hall D Solenoid System Hi-Pot Procedure
- D000000402P006 RevA
- Solenoid Quench Detector Tuning Procedure
- D000000402P005
- Hall-D Solenoid Commissioning Procedure
- D000000402P002