Difference between revisions of "Solenoid Expert"

From Hall D Ops Wiki
Jump to: navigation, search
(Operational Procedure)
(Operational Procedure)
Line 1: Line 1:
== Operational Procedure ==
+
== Procedure ==
  
[file:///M:/halld/crab.pdf title]
+
=== Operational Safety Procedure (OSP) ===
 +
 
 +
* Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc]
 +
* Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc]
 +
* Hall D SOlenoid Powered Operations [M:\halld_engineering\Solenoid\Commissioning\OSP\OSP - Hall D Solenoid Powered Operations.doc]
 +
 
 +
=== Commissioning Procedure ===
 +
 
 +
=== Operational Procedure ===
  
 
== Technical Reference ==
 
== Technical Reference ==

Revision as of 12:02, 18 June 2014

Procedure

Operational Safety Procedure (OSP)

  • Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc]
  • Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc]
  • Hall D SOlenoid Powered Operations [M:\halld_engineering\Solenoid\Commissioning\OSP\OSP - Hall D Solenoid Powered Operations.doc]

Commissioning Procedure

Operational Procedure

Technical Reference

Magnet

Power Supply

Cryogenics System

Programmable Logic Control (PLC)

PXI Fast DAQ System

Quench Detector

Ground Fault Detector