Difference between revisions of "Solenoid Expert"

From Hall D Ops Wiki
Jump to: navigation, search
(Operational Procedure)
(Operational Safety Procedure (OSP))
Line 3: Line 3:
 
=== Operational Safety Procedure (OSP) ===
 
=== Operational Safety Procedure (OSP) ===
  
 +
* <a href="file:///M:\halld\crab.pdf">Link text</a>
 
* Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc]
 
* Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc]
 
* Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc]
 
* Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc]

Revision as of 12:06, 18 June 2014

Procedure

Operational Safety Procedure (OSP)

  • <a href="file:///M:\halld\crab.pdf">Link text</a>
  • Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc]
  • Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc]
  • Hall D SOlenoid Powered Operations [M:\halld_engineering\Solenoid\Commissioning\OSP\OSP - Hall D Solenoid Powered Operations.doc]

Commissioning Procedure

Operational Procedure

Technical Reference

Magnet

Power Supply

Cryogenics System

Programmable Logic Control (PLC)

PXI Fast DAQ System

Quench Detector

Ground Fault Detector