Difference between revisions of "Solenoid Expert"
From Hall D Ops Wiki
(→Operational Procedure) |
(→Operational Safety Procedure (OSP)) |
||
Line 3: | Line 3: | ||
=== Operational Safety Procedure (OSP) === | === Operational Safety Procedure (OSP) === | ||
+ | * <a href="file:///M:\halld\crab.pdf">Link text</a> | ||
* Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc] | * Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc] | ||
* Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc] | * Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc] |
Revision as of 12:06, 18 June 2014
Contents
Procedure
Operational Safety Procedure (OSP)
- <a href="file:///M:\halld\crab.pdf">Link text</a>
- Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc]
- Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc]
- Hall D SOlenoid Powered Operations [M:\halld_engineering\Solenoid\Commissioning\OSP\OSP - Hall D Solenoid Powered Operations.doc]