Difference between revisions of "Solenoid Expert"

From Hall D Ops Wiki
Jump to: navigation, search
(Operation)
(Procedures: signed documents)
Line 4: Line 4:
 
* [[Solenoid Ramping Shift | Instructions for shift takers ]]
 
* [[Solenoid Ramping Shift | Instructions for shift takers ]]
  
=== Procedures: signed documents ===
+
= Procedures: signed documents =
  
 
== Operational Safety Procedure (OSP) ==
 
== Operational Safety Procedure (OSP) ==

Revision as of 18:36, 18 January 2017

Operation

Procedures: signed documents

Operational Safety Procedure (OSP)

Procedure and Checklist

Solenoid Cooldown Checklists
D000000402-P003 Rev A
Solenoid Vacuum System Controls Check Procedure
D000000402P004
Hall D Solenoid System Hi-Pot Procedure
D000000402P006 RevA
Solenoid Voltage Tap Check List
D000000402-P010
Hall D Solenoid Pre Power-Up Checklists
D000000402P007
Hall D Solenoid Magnet Power Supply Maintenance Turn-on Checklist
D000001611P000 Rev A
Hall D Solenoid Magnet Power Supply Internal Interlock Checklist
D000001611P001 Rev B
Ground Fault Detector Rheostat Setting Procedure
D000000402P011
Hall D Solenoid System Hi-Pot Procedure
D000000402P006 RevA
Solenoid Quench Detector Tuning Procedure
D000000402P005
Hall-D Solenoid Commissioning Procedure
D000000402P002

Technical References

Magnet

Power Supply

Cryogenics System

Programmable Logic Control (PLC)

PXI Fast DAQ System

Quench Detector

Ground Fault Detector

Old Wiki Page

https://halldweb1.jlab.org/wiki/index.php/Superconducting_Solenoid