Solenoid Expert
From Hall D Ops Wiki
Revision as of 12:14, 18 June 2014 by Yqiang (Talk | contribs) (→Operational Procedure and Checklist)
Contents
Procedure
Operational Safety Procedure (OSP)
- Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc]
- Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc]
- Hall D SOlenoid Powered Operations [M:\halld_engineering\Solenoid\Commissioning\OSP\OSP - Hall D Solenoid Powered Operations.doc]
Procedure and Checklist
- Magnet Turn-ON Procedure [M:\halld_engineering\Solenoid\Improvements after Aug'13 Test\140617Solenoid turn on trackingTracking.xlsx]