Popular pages

Jump to: navigation, search

Showing below up to 142 results in range #1 to #142.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. Main Page‏‎ (450,564 views)
  2. Beam Line Detectors Shift‏‎ (85,026 views)
  3. Forward Calorimeter Shift‏‎ (61,487 views)
  4. Solenoid Operations‏‎ (55,382 views)
  5. Slow Controls Shift‏‎ (47,988 views)
  6. Fall 2014 Commissioning Plan‏‎ (46,589 views)
  7. Level-1 Trigger Shift‏‎ (43,437 views)
  8. Spring 2015 Commissioning Plan‏‎ (35,978 views)
  9. Barrel Calorimeter Expert‏‎ (33,387 views)
  10. Tagging Spectrometer Shift‏‎ (25,606 views)
  11. Solenoid Expert‏‎ (25,324 views)
  12. Primer for shift takers‏‎ (24,132 views)
  13. Solenoid Ramping Shift‏‎ (22,679 views)
  14. Pair Spectrometer Shift‏‎ (22,016 views)
  15. Forward Calorimeter Expert‏‎ (18,634 views)
  16. Cryogenic Target Shift‏‎ (17,045 views)
  17. Offline Analysis Commissioning‏‎ (16,906 views)
  18. Information for Experts‏‎ (15,987 views)
  19. Forward Drift Chamber Shift‏‎ (15,841 views)
  20. Approved Procedures‏‎ (15,355 views)
  21. Hall D Runs‏‎ (15,313 views)
  22. Forward Drift Chamber Commissioning‏‎ (14,433 views)
  23. Data Acquisition Shift‏‎ (14,151 views)
  24. Training and Safety‏‎ (14,036 views)
  25. Spring 2015 6GeV Commissioning Plan‏‎ (13,818 views)
  26. Tune Photon Beam and collect data for initial detector checkout‏‎ (13,708 views)
  27. Online Monitoring Shift‏‎ (13,699 views)
  28. Electronics Shift‏‎ (12,457 views)
  29. Barrel Calorimeter Commissioning‏‎ (12,288 views)
  30. Central Drift Chamber Shift‏‎ (11,687 views)
  31. Configuration Management‏‎ (10,153 views)
  32. Standard Production Running Conditions‏‎ (10,125 views)
  33. Gas System Shift‏‎ (9,755 views)
  34. Short Term Run Plan‏‎ (9,326 views)
  35. Solid Target Shift Original‏‎ (9,134 views)
  36. Hall D Commissioning‏‎ (8,897 views)
  37. DIRC Shift‏‎ (8,571 views)
  38. Shift Guidelines for Shift Leader‏‎ (8,425 views)
  39. Guidelines for Remote Worker Shift‏‎ (8,296 views)
  40. Barrel Calorimeter Shift‏‎ (8,259 views)
  41. Time-of-Flight System Shift‏‎ (8,147 views)
  42. Tune Electron Beam‏‎ (8,109 views)
  43. Tune Photon Beam‏‎ (7,410 views)
  44. How-to Cheat Sheet‏‎ (7,298 views)
  45. Solenoid expert pxi‏‎ (6,918 views)
  46. Shift check-list‏‎ (6,775 views)
  47. Start Counter Shift‏‎ (6,752 views)
  48. Fall 2016 GlueX Run‏‎ (6,620 views)
  49. Start Counter Commissioning‏‎ (5,750 views)
  50. Shift Checklist‏‎ (5,452 views)
  51. Checklist maintenance (HCO) Expert‏‎ (5,193 views)
  52. Time-of-Flight System Expert‏‎ (5,097 views)
  53. Turn FDC ON‏‎ (5,015 views)
  54. Introduction Shift‏‎ (4,930 views)
  55. One Week Pause in Running‏‎ (4,892 views)
  56. Spring 2017 GlueX Run‏‎ (4,481 views)
  57. Getting Started‏‎ (4,158 views)
  58. Procedure installing solid target‏‎ (4,046 views)
  59. Post-thanksgiving period‏‎ (4,008 views)
  60. Optimize Detector Settings‏‎ (3,990 views)
  61. Fall 2018 GlueX Run‏‎ (3,794 views)
  62. Forward Calorimeter Commissioning‏‎ (3,638 views)
  63. RC Helpsheet‏‎ (3,629 views)
  64. Accessing Onsite Webpages From Offsite‏‎ (3,593 views)
  65. Collect Beam Data for Detector Checkout‏‎ (3,553 views)
  66. BTA guidelines‏‎ (3,510 views)
  67. Forward Multi-Wire Proportional Chambers Shift‏‎ (3,398 views)
  68. RF Signals Shift‏‎ (3,388 views)
  69. Compton Calorimeter Shift‏‎ (3,312 views)
  70. Best Practices/FAQ‏‎ (3,260 views)
  71. Summary Spring 2019 Run‏‎ (2,919 views)
  72. Run Tracking Sheets‏‎ (2,861 views)
  73. Drift Chamber Alignment‏‎ (2,651 views)
  74. Solenoid EPICS Screen‏‎ (2,647 views)
  75. DIRC Expert Instructions‏‎ (2,610 views)
  76. Collect More Regular Data‏‎ (2,531 views)
  77. Gas System Commissioning‏‎ (2,501 views)
  78. Solenoid expert magnet‏‎ (2,488 views)
  79. Central Drift Chamber Commissioning‏‎ (2,416 views)
  80. Beam Line Detectors Expert‏‎ (2,199 views)
  81. Finalize Photon Beam Commissioning and Optimize Detector Settings‏‎ (2,175 views)
  82. Summary of the Fall 2016 GlueX Run‏‎ (1,870 views)
  83. Run Planing Meeting 2018-08-02‏‎ (1,735 views)
  84. How to read temporary CARMS‏‎ (1,715 views)
  85. Cryogenic Target Expert‏‎ (1,692 views)
  86. Online Monitoring Expert‏‎ (1,542 views)
  87. HV Scan Fall 2016‏‎ (1,511 views)
  88. Start Counter Expert‏‎ (1,500 views)
  89. Solenoid expert plc‏‎ (1,487 views)
  90. Fall 2017 Spring 2018 GlueX Run‏‎ (1,474 views)
  91. Solid Target Shift‏‎ (1,434 views)
  92. Complaints by the crew!‏‎ (1,398 views)
  93. Run Planing Meeting 2018-08-09‏‎ (1,328 views)
  94. Run Coordinator‏‎ (1,259 views)
  95. Time-of-Flight System Commissioning‏‎ (1,199 views)
  96. Summary Fall 2021 Run‏‎ (1,132 views)
  97. Summary Fall 2019 Run‏‎ (1,126 views)
  98. Solenoid Commissioning‏‎ (1,094 views)
  99. Slow Controls Commissioning‏‎ (1,050 views)
  100. Level-1 Trigger Shift PrimEx‏‎ (1,049 views)
  101. Primer high voltages table‏‎ (985 views)
  102. Summary summer 2022 Run‏‎ (972 views)
  103. RC report Fall2021 w9‏‎ (914 views)
  104. Summary Fall 2022 Run‏‎ (888 views)
  105. Check beam position at the tagger dump‏‎ (871 views)
  106. Beam position from profilers‏‎ (851 views)
  107. Summary Spring 2020 Run‏‎ (830 views)
  108. Summary Winter 2023 Run‏‎ (722 views)
  109. Summary Summer 2020 Run‏‎ (705 views)
  110. LED Run Procedure‏‎ (698 views)
  111. Threshold Scan Procedure‏‎ (686 views)
  112. Check quad current‏‎ (673 views)
  113. Dummy page 3‏‎ (657 views)
  114. Tagging Spectrometer Expert‏‎ (598 views)
  115. Beam table fall14‏‎ (585 views)
  116. Solid Target Expert‏‎ (568 views)
  117. Summer 2022 detector checkout + CDC scans‏‎ (518 views)
  118. ONLINE MONITORING START OF RUN CHECKLIST‏‎ (517 views)
  119. Mark's Sandbox‏‎ (503 views)
  120. Forward Calorimeter Shift Comissioning Era‏‎ (474 views)
  121. Check PS Scaler rates‏‎ (469 views)
  122. Summer 2020 CDC HV scan procedure‏‎ (436 views)
  123. Summary of the Spring 2017 Run‏‎ (420 views)
  124. Sweeping magnet Shift‏‎ (397 views)
  125. On Shift: Current Issues‏‎ (377 views)
  126. Gluon Cluster Overview‏‎ (370 views)
  127. Active Collimator‏‎ (367 views)
  128. Howto read ST scallers‏‎ (358 views)
  129. Logbook Screenshot Tool‏‎ (352 views)
  130. Run Planning Meetings Fall 2018 Running‏‎ (332 views)
  131. Winter 2023 detector checkout + CDC scan‏‎ (320 views)
  132. How to read BCAL Scalers‏‎ (315 views)
  133. Summary of the Fall 2015‏‎ (270 views)
  134. Fall 2018 CDC HV scan procedure‏‎ (266 views)
  135. Compton Calorimeter‏‎ (264 views)
  136. Summary of the Spring 2018 Run‏‎ (263 views)
  137. Four counting room cameras‏‎ (260 views)
  138. Summary of the Spring 2015 GlueX Run‏‎ (238 views)
  139. Summary of the Spring 2016 Run‏‎ (152 views)
  140. FDC timing calibration‏‎ (87 views)
  141. Summary Winter 2024 Run‏‎ (43 views)
  142. LogbookScreenshotTool‏‎ (28 views)

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)