Short pages

Jump to: navigation, search

Showing below up to 142 results in range #1 to #142.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. (hist) ‎On Shift: Current Issues ‎[0 bytes]
  2. (hist) ‎Solenoid Commissioning ‎[4 bytes]
  3. (hist) ‎Dummy page 3 ‎[17 bytes]
  4. (hist) ‎Slow Controls Commissioning ‎[44 bytes]
  5. (hist) ‎Four counting room cameras ‎[79 bytes]
  6. (hist) ‎FDC timing calibration ‎[82 bytes]
  7. (hist) ‎Fall 2018 GlueX Run ‎[106 bytes]
  8. (hist) ‎Run Planning Meetings Fall 2018 Running ‎[118 bytes]
  9. (hist) ‎Beam Line Detectors Expert ‎[157 bytes]
  10. (hist) ‎How to read BCAL Scalers ‎[239 bytes]
  11. (hist) ‎Shift Checklist ‎[277 bytes]
  12. (hist) ‎Mark's Sandbox ‎[348 bytes]
  13. (hist) ‎Getting Started ‎[353 bytes]
  14. (hist) ‎Solid Target Expert ‎[364 bytes]
  15. (hist) ‎Howto read ST scallers ‎[375 bytes]
  16. (hist) ‎Cryogenic Target Expert ‎[379 bytes]
  17. (hist) ‎Active Collimator ‎[408 bytes]
  18. (hist) ‎Check PS Scaler rates ‎[523 bytes]
  19. (hist) ‎Run Coordinator ‎[541 bytes]
  20. (hist) ‎Sweeping magnet Shift ‎[541 bytes]
  21. (hist) ‎Beam position from profilers ‎[549 bytes]
  22. (hist) ‎Check beam position at the tagger dump ‎[556 bytes]
  23. (hist) ‎Summary Fall 2019 Run ‎[566 bytes]
  24. (hist) ‎Fall 2018 CDC HV scan procedure ‎[571 bytes]
  25. (hist) ‎Summary of the Spring 2017 Run ‎[581 bytes]
  26. (hist) ‎Complaints by the crew! ‎[589 bytes]
  27. (hist) ‎Compton Calorimeter ‎[682 bytes]
  28. (hist) ‎ONLINE MONITORING START OF RUN CHECKLIST ‎[744 bytes]
  29. (hist) ‎How-to Cheat Sheet ‎[781 bytes]
  30. (hist) ‎Summer 2020 CDC HV scan procedure ‎[831 bytes]
  31. (hist) ‎Summary Summer 2020 Run ‎[878 bytes]
  32. (hist) ‎Beam table fall14 ‎[913 bytes]
  33. (hist) ‎DIRC Expert Instructions ‎[913 bytes]
  34. (hist) ‎Drift Chamber Alignment ‎[932 bytes]
  35. (hist) ‎Run Tracking Sheets ‎[943 bytes]
  36. (hist) ‎Introduction Shift ‎[966 bytes]
  37. (hist) ‎Summary summer 2022 Run ‎[986 bytes]
  38. (hist) ‎One Week Pause in Running ‎[994 bytes]
  39. (hist) ‎Summary Winter 2023 Run ‎[1,021 bytes]
  40. (hist) ‎Check quad current ‎[1,063 bytes]
  41. (hist) ‎LED Run Procedure ‎[1,067 bytes]
  42. (hist) ‎Gas System Commissioning ‎[1,113 bytes]
  43. (hist) ‎Solenoid EPICS Screen ‎[1,138 bytes]
  44. (hist) ‎Summary Spring 2020 Run ‎[1,220 bytes]
  45. (hist) ‎Summary Spring 2019 Run ‎[1,226 bytes]
  46. (hist) ‎Solenoid expert plc ‎[1,296 bytes]
  47. (hist) ‎Run Planing Meeting 2018-08-09 ‎[1,342 bytes]
  48. (hist) ‎Collect More Regular Data ‎[1,413 bytes]
  49. (hist) ‎Collect Beam Data for Detector Checkout ‎[1,423 bytes]
  50. (hist) ‎Information for Experts ‎[1,438 bytes]
  51. (hist) ‎Gluon Cluster Overview ‎[1,656 bytes]
  52. (hist) ‎Summary Fall 2021 Run ‎[1,682 bytes]
  53. (hist) ‎Hall D Commissioning ‎[1,696 bytes]
  54. (hist) ‎How to read temporary CARMS ‎[1,722 bytes]
  55. (hist) ‎Summary Fall 2022 Run ‎[1,733 bytes]
  56. (hist) ‎Solid Target Shift Original ‎[1,812 bytes]
  57. (hist) ‎Summary of the Fall 2015 ‎[1,869 bytes]
  58. (hist) ‎Run Planing Meeting 2018-08-02 ‎[1,970 bytes]
  59. (hist) ‎Tagging Spectrometer Expert ‎[2,034 bytes]
  60. (hist) ‎Summary Winter 2024 Run ‎[2,106 bytes]
  61. (hist) ‎RC report Fall2021 w9 ‎[2,111 bytes]
  62. (hist) ‎Solid Target Shift ‎[2,156 bytes]
  63. (hist) ‎Configuration Management ‎[2,169 bytes]
  64. (hist) ‎Threshold Scan Procedure ‎[2,188 bytes]
  65. (hist) ‎Winter 2023 detector checkout + CDC scan ‎[2,264 bytes]
  66. (hist) ‎Summer 2022 detector checkout + CDC scans ‎[2,347 bytes]
  67. (hist) ‎Data Acquisition Shift ‎[2,352 bytes]
  68. (hist) ‎RF Signals Shift ‎[2,393 bytes]
  69. (hist) ‎LogbookScreenshotTool ‎[2,439 bytes]
  70. (hist) ‎Logbook Screenshot Tool ‎[2,519 bytes]
  71. (hist) ‎Approved Procedures ‎[2,540 bytes]
  72. (hist) ‎Best Practices/FAQ ‎[2,543 bytes]
  73. (hist) ‎Summary of the Spring 2016 Run ‎[2,604 bytes]
  74. (hist) ‎Summary of the Spring 2018 Run ‎[2,604 bytes]
  75. (hist) ‎Tune Electron Beam ‎[2,647 bytes]
  76. (hist) ‎Summary of the Spring 2015 GlueX Run ‎[2,648 bytes]
  77. (hist) ‎Training and Safety ‎[2,873 bytes]
  78. (hist) ‎HV Scan Fall 2016 ‎[2,878 bytes]
  79. (hist) ‎Spring 2017 GlueX Run ‎[2,905 bytes]
  80. (hist) ‎Fall 2016 GlueX Run ‎[2,968 bytes]
  81. (hist) ‎Cryogenic Target Shift ‎[3,016 bytes]
  82. (hist) ‎BTA guidelines ‎[3,080 bytes]
  83. (hist) ‎Solenoid Expert ‎[3,096 bytes]
  84. (hist) ‎Fall 2017 Spring 2018 GlueX Run ‎[3,114 bytes]
  85. (hist) ‎Procedure installing solid target ‎[3,197 bytes]
  86. (hist) ‎Forward Calorimeter Commissioning ‎[3,396 bytes]
  87. (hist) ‎Compton Calorimeter Shift ‎[3,499 bytes]
  88. (hist) ‎Primer high voltages table ‎[3,610 bytes]
  89. (hist) ‎Hall D Runs ‎[3,712 bytes]
  90. (hist) ‎Shift check-list ‎[3,721 bytes]
  91. (hist) ‎RC Helpsheet ‎[3,900 bytes]
  92. (hist) ‎Solenoid expert magnet ‎[3,938 bytes]
  93. (hist) ‎Accessing Onsite Webpages From Offsite ‎[3,991 bytes]
  94. (hist) ‎Short Term Run Plan ‎[4,136 bytes]
  95. (hist) ‎Start Counter Shift ‎[4,439 bytes]
  96. (hist) ‎Electronics Shift ‎[4,949 bytes]
  97. (hist) ‎Checklist maintenance (HCO) Expert ‎[4,982 bytes]
  98. (hist) ‎Time-of-Flight System Shift ‎[5,032 bytes]
  99. (hist) ‎Forward Drift Chamber Shift ‎[5,178 bytes]
  100. (hist) ‎Gas System Shift ‎[5,291 bytes]
  101. (hist) ‎Turn FDC ON ‎[5,330 bytes]
  102. (hist) ‎Start Counter Expert ‎[5,873 bytes]
  103. (hist) ‎Level-1 Trigger Shift PrimEx ‎[5,945 bytes]
  104. (hist) ‎Solenoid expert pxi ‎[5,983 bytes]
  105. (hist) ‎Standard Production Running Conditions ‎[6,101 bytes]
  106. (hist) ‎Pair Spectrometer Shift ‎[6,164 bytes]
  107. (hist) ‎DIRC Shift ‎[6,306 bytes]
  108. (hist) ‎Forward Multi-Wire Proportional Chambers Shift ‎[6,316 bytes]
  109. (hist) ‎Shift Guidelines for Shift Leader ‎[6,342 bytes]
  110. (hist) ‎Time-of-Flight System Expert ‎[6,490 bytes]
  111. (hist) ‎Forward Drift Chamber Commissioning ‎[6,561 bytes]
  112. (hist) ‎Online Monitoring Expert ‎[6,623 bytes]
  113. (hist) ‎Offline Analysis Commissioning ‎[6,720 bytes]
  114. (hist) ‎Barrel Calorimeter Commissioning ‎[7,325 bytes]
  115. (hist) ‎Forward Calorimeter Shift ‎[7,327 bytes]
  116. (hist) ‎Barrel Calorimeter Shift ‎[7,401 bytes]
  117. (hist) ‎Fall 2014 Commissioning Plan ‎[7,430 bytes]
  118. (hist) ‎Time-of-Flight System Commissioning ‎[7,447 bytes]
  119. (hist) ‎Central Drift Chamber Commissioning ‎[7,642 bytes]
  120. (hist) ‎Start Counter Commissioning ‎[7,676 bytes]
  121. (hist) ‎Optimize Detector Settings ‎[7,905 bytes]
  122. (hist) ‎Level-1 Trigger Shift ‎[7,997 bytes]
  123. (hist) ‎Tagging Spectrometer Shift ‎[8,424 bytes]
  124. (hist) ‎Central Drift Chamber Shift ‎[8,543 bytes]
  125. (hist) ‎Solenoid Ramping Shift ‎[8,805 bytes]
  126. (hist) ‎Main Page ‎[8,979 bytes]
  127. (hist) ‎Post-thanksgiving period ‎[9,154 bytes]
  128. (hist) ‎Forward Calorimeter Shift Comissioning Era ‎[9,521 bytes]
  129. (hist) ‎Finalize Photon Beam Commissioning and Optimize Detector Settings ‎[9,704 bytes]
  130. (hist) ‎Online Monitoring Shift ‎[9,833 bytes]
  131. (hist) ‎Solenoid Operations ‎[11,544 bytes]
  132. (hist) ‎Forward Calorimeter Expert ‎[12,569 bytes]
  133. (hist) ‎Tune Photon Beam ‎[12,924 bytes]
  134. (hist) ‎Guidelines for Remote Worker Shift ‎[13,949 bytes]
  135. (hist) ‎Summary of the Fall 2016 GlueX Run ‎[14,779 bytes]
  136. (hist) ‎Tune Photon Beam and collect data for initial detector checkout ‎[16,318 bytes]
  137. (hist) ‎Spring 2015 Commissioning Plan ‎[16,657 bytes]
  138. (hist) ‎Primer for shift takers ‎[17,218 bytes]
  139. (hist) ‎Spring 2015 6GeV Commissioning Plan ‎[19,522 bytes]
  140. (hist) ‎Barrel Calorimeter Expert ‎[24,502 bytes]
  141. (hist) ‎Beam Line Detectors Shift ‎[27,905 bytes]
  142. (hist) ‎Slow Controls Shift ‎[29,068 bytes]

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)