Difference between revisions of "Spring 2017 GlueX Run"

From Hall D Ops Wiki
Jump to: navigation, search
m
m
 
Line 1: Line 1:
#REDIRECT [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run]
 
 
<!--
 
 
==General Information==
 
==General Information==
  
Line 52: Line 49:
 
==Detailed Running Plan==
 
==Detailed Running Plan==
 
*[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run Run Coordination Meetings]
 
*[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run Run Coordination Meetings]
-->
 

Latest revision as of 17:00, 23 January 2017

General Information

Run Configuration

  • Beam energy: 11.632 GeV
  • Solenoid on at 1350A.
  • Beam current: CW 1 nA-2μA, 250 MHz frequency. See RSAD for the RadCon limitations.
    • Regular running: 150 nA on 4.1·10-4 radiator
    • High intensity tests: 3 shifts at 1 µA on 4.1·10-4 radiator
  • Diamond radiators:
    • J1a50       (50 μm - 4.1·10-4 R.L., 4×4 mm²) - old crystal - excellent rocking curve
    • JD70-100 (58 μm - 4.8·10-4 R.L., 7×7 mm²) - new crystal - excellent rocking curve
    • JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - new crystal - good rocking curve
    • JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) - new crystal - wider rocking curve - marginally usable
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: 5 mm diameter with ≈50 µm diamond radiators, may use 3.4 mm diameter with ≈20 µm diamonds
  • Target: LH2 target

Schedule Details

  1. Jan. 26th-Jan. 29th: Electron beam restoration
  2. Jan. 30th-Mar. 22nd: Hall D Spring run.
  3. Every Tuesdays: 12h of beam study. Every Thursdays, if necessary: 8h of RF recovery.

List of Run Coordinators and Physics Division Liaison

  • RCs:
    • Thur. Jan. 26 - Sun. Jan. 29 (4 days): A. Deur (accelerator restoration)
    • Mon. Jan. 30 - Wed. Feb. 8 (10 days): A. Deur
    • Wed. Feb. 8 - Wed. Feb. 15 (7 days): M. Dalton (with Mon. 6th - Wed. 8th overlap)
    • Wed. Feb. 15 - Wed. Feb. 22 (7 days): A. Ostrovidov (with Mon. 13th - Wed. 15th overlap)
    • Wed. Feb. 22 - Wed. Mar. 1 (7 days): W. Boeglin (with Mon. 20th - Wed. 22nd overlap)
    • Wed. Mar. 1 - Wed. Mar. 8: (7 days): S. Dobbs (with Mon. 27th - Wed. 1st overlap)
    • Wed. Mar. 8 - Wed. Mar. 15: (7 days): R. Jones (with Mon. 6th - Wed. 8th overlap)
    • Wed. Mar. 15 - Wed. Mar. 22: (7 days): D. Lawrence (with Mon. 13th - Wed. 15th overlap)
    • PDL, Benedikt Zihlmann

Detailed Running Plan