Spring 2017 GlueX Run

From Hall D Ops Wiki
Revision as of 12:53, 29 December 2016 by Cmeyer (Talk | contribs) (Run Configuration)

Jump to: navigation, search

General Information

Run Configuration

  • Beam energy: 11.632 GeV
  • Solenoid on at 1350A.
  • Beam current: CW 1 nA-2μA, 250 MHz frequency. See RSAD for the RadCon limitations.
    • Regular running: 150 nA on 4.1·10-4 radiator
    • High intensity tests: 3 shifts at 1 µA on 4.1·10-4 radiator
  • Diamond radiators:
    • J1a50       (50 μm - 4.1·10-4 R.L., 4×4 mm²) - old crystal - excellent rocking curve
    • JD70-100 (58 μm - 4.8·10-4 R.L., 7×7 mm²) - new crystal - excellent rocking curve
    • JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - new crystal - good rocking curve
    • JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) - new crystal - wider rocking curve - marginally usable
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: 5 mm diameter with ≈50 µm diamond radiators, may use 3.4 mm diameter with ≈20 µm diamonds
  • Target: LH2 target

Schedule Details

  1. Jan. 26th-Jan. 29th: Electron beam restoration
  2. Jan. 30th-Mar. 22nd: Hall D Spring run.
  3. Every Tuesdays: 12h of beam study. Every Thursdays, if necessary: 8h of RF recovery.

List of Run Coordinators and Physics Division Liaison

  • RCs:
    • Thur. Jan. 26 - Sun. Jan. 29 (4 days): (accelerator restoration)
    • Mon. Jan. 30 - Wed. Feb. 8 (10 days):
    • Wed. Feb. 8 - Wed. Feb. 22 (14 days):
    • Wed. Feb. 22 - Wed. Mar. 8 (14 days):
    • Wed. Mar. 8 - Wed. Mar. 22: (14 days):
    • PDL, Benedikt Zihlmann

Detailed Running Plan