0000253: Install ControlNet cable between Hall D and Cryo Service building
Communication between the Hall D and Cryo PLC systems will be done via ControlNet. A cable needs to be installed between the two buildings.
Jonathan said he has the cable and connectors. He said his techs will actually install the cable.
No tags attached.
Issue History
2012-04-24 14:21wolinNew Issue
2012-04-24 14:21wolinWork by outside group for Hall D => No
2012-04-24 14:21wolinEstimated man-weeks => 1
2012-04-24 14:21wolinPercentage complete => 0
2012-04-24 14:21wolinActual man-weeks => 0
2012-04-24 14:25wolinStatusnew => assigned
2012-04-24 14:25wolinAssigned To => creel
2012-04-24 14:25wolinAdditional Information Updated
2012-05-09 11:32wolinNote Added: 0000368
2013-03-19 13:05wolinNote Added: 0000485
2013-03-19 13:05wolinStatusassigned => resolved
2013-03-19 13:05wolinResolutionopen => fixed

Notes
(0000368)
wolin   
2012-05-09 11:32   
Best strategy seems to be to run the line to the PLC chassis in Rack Room.
(0000485)
wolin   
2013-03-19 13:05   
We decided this isn't needed. We may install on at a later date.