MantisBT - Hall D Online
View Issue Details
0000255Hall D OnlineControlspublic2012-04-24 14:582012-08-08 14:44
wolin 
wolin 
normalfeatureN/A
resolvedfixed 
Yes
1
0
0
0000255: Arrange for Andrew Kimber's (originally Bill Merz's) group to perform routine maintenance on all our power supplies
No need to bring in Danfysik, Bill said his group has the expertise.
No tags attached.
Issue History
2012-04-24 14:58wolinNew Issue
2012-04-24 14:58wolinWork by outside group for Hall D => Yes
2012-04-24 14:58wolinEstimated man-weeks => 1
2012-04-24 14:58wolinPercentage complete => 0
2012-04-24 14:58wolinActual man-weeks => 0
2012-04-24 14:58wolinStatusnew => assigned
2012-04-24 14:58wolinAssigned To => wolin
2012-04-24 14:58wolinNote Added: 0000361
2012-04-24 14:58wolinStatusassigned => acknowledged
2012-06-14 15:53wolinNote Added: 0000387
2012-06-14 15:53wolinSummaryArrange for Bill Merz's group to perform routine maintenance on all our power supplies => Arrange for Andrew Kimber's (originally Bill Merz's) group to perform routine maintenance on all our power supplies
2012-06-14 15:54wolinNote Added: 0000388
2012-08-08 14:44wolinNote Added: 0000422
2012-08-08 14:44wolinStatusacknowledged => resolved
2012-08-08 14:44wolinResolutionopen => fixed

Notes
(0000361)
wolin   
2012-04-24 14:58   
Need to get information on manpower each year
(0000387)
wolin   
2012-06-14 15:53   
Andrew Kimber now in charge of power supply maintenance.
(0000388)
wolin   
2012-06-14 15:54   
Solenoid Danfysik supply should be running by end of July 2012, can begin maintenance then.
(0000422)
wolin   
2012-08-08 14:44   
We have decided not to use Kimber's group at this point. Mark will perform whatever maintenance is needed, possibly in consultation with Kimber's group. We may bring them in at a later stage, though.