MantisBT - Hall D Online
View Issue Details
0000256Hall D OnlineControlspublic2012-04-24 15:022013-03-19 11:54
wolin 
hovanes 
normalfeatureN/A
resolvedfixed 
Yes
1
0
0
0000256: Arrange for Accelerator to manage power supplies in Hall D
After meeting with Accelerator it seems natural for them to take over programming and maintenance of two supplies in the Tagger Hall and two in Hall D. This leaves just the solenoid supply in the hall, and we hope to arrange for Bill Merz's group to take over maintenance of this supply.
Need costs from Accelerator. Matt Bickley says they would connect to the Accelerator controls network via Accelerator switches in the Tagger Service building and the Counting House Telecom Room.
No tags attached.
Issue History
2012-04-24 15:02wolinNew Issue
2012-04-24 15:02wolinWork by outside group for Hall D => Yes
2012-04-24 15:02wolinEstimated man-weeks => 1
2012-04-24 15:02wolinPercentage complete => 0
2012-04-24 15:02wolinActual man-weeks => 0
2012-04-24 15:02wolinStatusnew => assigned
2012-04-24 15:02wolinAssigned To => hovanes
2013-03-19 11:54wolinNote Added: 0000477
2013-03-19 11:54wolinStatusassigned => resolved
2013-03-19 11:54wolinResolutionopen => fixed

Notes
(0000477)
wolin   
2013-03-19 11:54   
I believe this has been arranged.