0000270: Develop goals for solenoid test
Develop goals for solenoid test, needed as input for developing a test plan.
No tags attached.
Issue History
2012-07-11 09:25wolinNew Issue
2012-07-11 09:25wolinWork by outside group for Hall D => No
2012-07-11 09:25wolinEstimated man-weeks => 1
2012-07-11 09:25wolinPercentage complete => 0
2012-07-11 09:25wolinActual man-weeks => 0
2012-07-11 09:25wolinStatusnew => assigned
2012-07-11 09:25wolinAssigned To => wolin
2012-07-11 09:25wolinNote Added: 0000396
2012-07-11 09:25wolinStatusassigned => acknowledged
2012-07-16 11:27wolinNote Added: 0000398
2012-07-17 15:03wolinNote Added: 0000410
2012-07-17 15:03wolinNote Edited: 0000410
2012-07-20 11:49wolinNote Added: 0000411
2012-07-20 11:49wolinStatusacknowledged => resolved
2012-07-20 11:49wolinResolutionopen => fixed
2012-08-20 10:24wolinNote Edited: 0000411

Notes
(0000396)
wolin   
2012-07-11 09:25   
Hope to get this out this week.
(0000398)
wolin   
2012-07-16 11:27   
Goals for the Solenoid Test

1. Verify correct operation of mechanical systems and control/monitoring/archiving system.
2. Demonstrate proper cooldown from room temperature to LHe temperature and filling of the LHe vessel.
3. Demonstrate stable cryogenic operation with full LHe vessel for minimum 24 hours with minimal operator intervention required.
4. Demonstrate proper ramp-up of the magnet to full current (1500A) and stable operation at full current for minimum 4 hours with minimal operator intervention required.
5. Perform field measurements to verify numerical models of the field are correct.
6. Demonstrate proper ramp-down to 0A.
7. Demonstrate fast-dump and slow-dump systems are working properly.
8. Demonstrate other safety systems work properly.
9. Verify there are no turn-to-turn shorts or other anomolous behaviours during powered operations.
10. Demonstrate ability of control system to maintain long-term stable behaviour at LN2 temperatures.
(0000410)
wolin   
2012-07-17 15:03   
Updated goals:


Goals for the Solenoid Test

1. Verify correct operation of mechanical, safety and control/monitoring/archiving systems.
2. Demonstrate proper cooldown from room temperature to LHe temperature and filling of the LHe vessel.
3. Demonstrate stable cryogenic operation with full LHe vessel for minimum 24 hours with minimal operator intervention required.
4. Demonstrate proper ramp-up of the magnet to full current (1500A) and stable operation at full current for minimum 4 hours with minimal operator intervention required.
5. Perform field measurements to verify that numerical models of the field are correct.
6. Demonstrate proper ramp-down to 0A.
7. Demonstrate fast-dump and slow-dump systems are working properly.
8. Verify there are no turn-to-turn shorts or other anomolous behaviours during powered operations.

(0000411)
wolin   
2012-07-20 11:49   
(edited on: 2012-08-20 10:24)
Received no comments, assume goals are ok. Not sure who to send them to...Glenn? Claus?

See GlueX doc 2042 in the DocDB.