0000360: Monitoring data challenge
Perform monitoring data challenge in late summer. Determine scope and develop goals.
Probable goal is to move data from event builder through monitoring farm to storage on the silo, with creation and archiving of monitoring histograms.
No tags attached.
Issue History
2013-06-26 16:54wolinNew Issue
2013-06-26 16:54wolinWork by outside group for Hall D => No
2013-06-26 16:54wolinEstimated man-weeks => 4
2013-06-26 16:54wolinPercentage complete => 0
2013-06-26 16:54wolinActual man-weeks => 0
2013-06-26 16:54wolinStatusnew => assigned
2013-06-26 16:54wolinAssigned To => wolin
2013-06-26 16:54wolinNote Added: 0000546
2013-06-26 16:54wolinStatusassigned => acknowledged
2013-07-18 09:12wolinNote Added: 0000552
2013-09-09 17:16wolinNote Added: 0000574
2013-09-09 17:16wolinStatusacknowledged => resolved
2013-09-09 17:16wolinResolutionopen => fixed

Notes
(0000546)
wolin   
2013-06-26 16:54   
Dave Lawrence and Sean Dobbs will be intimately involved in this.
(0000552)
wolin   
2013-07-18 09:12   
Sean should arrive in late Aug. I created evio2et and et2evio to feed the system and write events to disk. Event transfer to the silo will be either manual or by simple scripts, full system still to be designed by CC. Paul will implement Ganglia for farm monitoring. No farm manager will be used. Dave still working on translation table stuff.
(0000574)
wolin   
2013-09-09 17:16   
Done, currently preparing a document. Very useful, led to many improvements. Next data challenge for late fall, will include data path from ROC to silo, and we'll use CODA3.