MantisBT - Hall D Online
View Issue Details
0000090Hall D OnlineDAQpublic2011-06-17 14:482011-10-31 13:52
wolin 
heyes 
normalfeatureN/A
resolvedfixed 
Yes
6
100
2
0000090: Design farm manager CODA component
Collect requirements and design a monitoring and level 3 farm manager for use in the Hall D Online/DAQ environment. Create prototype and test in simulated but realistic farm environment, if required. Deliver report that summarizes results and includes an outline of steps needed to create and commission production farm manager with estimates of required time and manpower.
Consult as required with the Hall D Online group concerning the specific requirements and constraints of the Hall D computing system. Major architectural decisions must be reviewed by the Hall D Online group to ensure compatibility with the experiment online environment.

This task is assigned to Vardan, I will keep myself (Heyes) in the "assigned to" field.
No tags attached.
Issue History
2011-06-17 14:48wolinNew Issue
2011-06-17 14:48wolinWork by outside group for Hall D => Yes
2011-06-17 14:48wolinEstimated man-weeks => 6
2011-06-17 14:48wolinPercentage complete => 0
2011-06-17 14:48wolinActual man-weeks => 0
2011-06-17 14:49wolinAdditional Information Updated
2011-06-17 15:25wolinDescription Updated
2011-06-17 15:44wolinSummaryCreate farm manager CODA component => Design farm manager CODA component
2011-06-20 10:13wolinStatusnew => assigned
2011-06-20 10:13wolinAssigned To => heyes
2011-06-20 10:16wolinNote Added: 0000118
2011-06-20 10:18wolinNote Added: 0000124
2011-06-20 10:18wolinStatusassigned => feedback
2011-07-15 11:16heyesNote Added: 0000144
2011-07-15 11:16heyesStatusfeedback => assigned
2011-07-15 11:16heyesDescription Updated
2011-07-15 11:16heyesAdditional Information Updated
2011-10-12 14:55wolinNote Added: 0000170
2011-10-31 13:51wolinPercentage complete0 => 100
2011-10-31 13:51wolinActual man-weeks0 => 2
2011-10-31 13:51wolinNote Added: 0000190
2011-10-31 13:52wolinNote Added: 0000191
2011-10-31 13:52wolinStatusassigned => resolved
2011-10-31 13:52wolinResolutionopen => fixed

Notes
(0000118)
wolin   
2011-06-20 10:16   
Graham...kindly review the task description and modify as required, especially the estimated man-weeks of effort needed. We'll iterate as needed.
(0000124)
wolin   
2011-06-20 10:18   
Please update task description as needed
(0000144)
heyes   
2011-07-15 11:16   
I don't know where the man week estimate came from but it will be updated after preliminary discussions of scope and priority are complete.

I removed the text "CODA component" from the description. It may be that the farm manager is a framework based on a combination of AFECS, ET and CMSG. Maybe even some online adaptation of CLARA.
(0000170)
wolin   
2011-10-12 14:55   
Vardan is about done with the planning/prototyping, final report within the next week or so expected. Next task for Vardan will be the Experiment Control Supervisor and GUI.
(0000190)
wolin   
2011-10-31 13:51   
Vardan's final report is in the DocDB number 1857.
(0000191)
wolin   
2011-10-31 13:52   
Vardan submitted his final report