MantisBT

View Issue Details Jump to Notes ] Issue History ] Print ]
IDProjectCategoryView StatusDate SubmittedLast Update
0000247Hall D OnlineComputerspublic2012-04-20 09:042013-03-20 18:05
Reporterwolin 
Assigned To 
PrioritynormalSeverityfeatureReproducibilityN/A
StatusnewResolutionopen 
PlatformOSOS Version
Summary0000247: Learn how to query the status of the counting house and other UPS's
DescriptionThe control system needs to know if UPS's are running on line or battery power, and how much battery power is left. Figure out how to obtain this information for our existing UPS's and how this information might be accessed by the PLC and EPICS.
TagsNo tags attached.
Work by outside group for Hall DNo
Estimated man-weeks2
Percentage complete0
Actual man-weeks0
Attached Files

- Relationships

-  Notes
(0000373)
wolin (administrator)
2012-05-30 17:09

CNU summer student Rob Ryan will be looking into this. Mike Johnson has an EPICS way of doing this, Vardan can do this in AFECS. Current thinking is that the AFECS mechanism is the way to go.
(0000389)
wolin (administrator)
2012-06-25 15:07

From Mark Stevens:

I recall that you are perhaps having a student look at the software/internet monitoring of the Libert UPS in the counting room. Are you aware that the RDC has the capability of communicating too, with optional equipment? And are you aware that the RDC may have a built-in monitoring system that self-protects and sends out alarms for overcurrent, and that it is factory-programmed for single-phase 20 Amp circuits? Will we need to reprogram this system to avoid erroneous faults, because we are installing larger circuits? I read about all of this in the Liebert RDC manual, while I was looking for information about circuit breakers. Perhaps your student could check this out.
(0000495)
wolin (administrator)
2013-03-20 18:04

Rob is gone, no progress...

- Issue History
Date Modified Username Field Change
2012-04-20 09:04 wolin New Issue
2012-04-20 09:04 wolin Work by outside group for Hall D => No
2012-04-20 09:04 wolin Estimated man-weeks => 2
2012-04-20 09:04 wolin Percentage complete => 0
2012-04-20 09:04 wolin Actual man-weeks => 0
2012-04-20 09:04 wolin Summary Learn how to query status of the counting house and other UPS => Learn how to query the status of the counting house and other UPS's
2012-05-30 17:09 wolin Note Added: 0000373
2012-05-30 17:17 wolin Status new => assigned
2012-05-30 17:17 wolin Assigned To => rryan
2012-06-25 15:07 wolin Note Added: 0000389
2013-03-20 18:04 wolin Note Added: 0000495
2013-03-20 18:04 wolin Status assigned => new
2013-03-20 18:05 wolin Assigned To rryan =>


Copyright © 2000 - 2024 MantisBT Team
Powered by Mantis Bugtracker