https://halldweb.jlab.org/wiki/api.php?action=feedcontributions&user=Marianak&feedformat=atomGlueXWiki - User contributions [en]2024-03-29T14:43:10ZUser contributionsMediaWiki 1.24.1https://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117355Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T18:34:38Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Maintenance day, multiple people worked in the hall.<br />
* Did harp scan when the beam was back (23:50 pm). The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 0.6 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. Will be replaced when there are spare modules.<br />
* The right CO2 and Argon gas supplies look low, also Thomas mentioned that right CO2 canister was making a possibly anomalous buzzing sound.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.<br />
* Igal taking over run coordination at 1:30 pm.<br />
* Hall C plans to do luminosity scan on Thursday with 70 uA, so the beam might become unstable.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117337Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T14:30:32Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Maintenance day, multiple people worked in the hall.<br />
* Did harp scan when the beam was back (23:50 pm). The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 0.6 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. Will be replaced when there are spare modules.<br />
* The right CO2 and Argon gas supplies look low, also Thomas mentioned that right CO2 canister was making a possibly anomalous buzzing sound.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.<br />
* Igal taking over run coordination at 1:30 pm.<br />
* Hall C plans to do luminosity scan tomorrow with 70 uA, so the beam might become unstable.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117336Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T14:29:38Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Maintenance day, multiple people worked in the hall.<br />
* Did harp scan when the beam was back (23:50 pm). The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 0.6 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
* The right CO2 and Argon gas supplies look low, also Thomas mentioned that right CO2 canister was making a possibly anomalous buzzing sound.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.<br />
* Igal taking over run coordination at 1:30 pm.<br />
* Hall C plans to do luminosity scan tomorrow with 70 uA, so the beam might become unstable.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117312Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T12:26:07Z<p>Marianak: /* Past 24 hours */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Maintenance day, multiple people worked in the hall.<br />
* Did harp scan when the beam was back (23:50 pm). The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 0.6 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
* The right CO2 and Argon gas supplies look low, also Thomas mentioned that right CO2 canister was making a possibly anomalous buzzing sound.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.<br />
* Igal taking over run coordination at 1:30 pm.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117311Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T12:25:08Z<p>Marianak: /* Past 24 hours */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Did harp scan when the beam was back (23:50 pm). The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 0.6 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
* The right CO2 and Argon gas supplies look low, also Thomas mentioned that right CO2 canister was making a possibly anomalous buzzing sound.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.<br />
* Igal taking over run coordination at 1:30 pm.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117310Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T12:21:11Z<p>Marianak: /* Past 24 hours */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Did harp scan when the beam was back (23:50 pm). The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
* The right CO2 and Argon gas supplies look low, also Thomas mentioned that right CO2 canister was making a possibly anomalous buzzing sound.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.<br />
* Igal taking over run coordination at 1:30 pm.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117309Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T12:18:09Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Did harp scan when the beam was back. The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
* The right CO2 and Argon gas supplies look low, also Thomas mentioned that right CO2 canister was making a possibly anomalous buzzing sound.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.<br />
* Igal taking over run coordination at 1:30 pm.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117308Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T12:09:54Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Did harp scan when the beam was back. The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.<br />
* Igal taking over run coordination at 1:30 pm.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117307Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T12:09:27Z<p>Marianak: /* Shift Summary */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Did harp scan when the beam was back. The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117306Run Planning Meeting Noters, November 9- November 16, 20222022-11-16T12:07:12Z<p>Marianak: /* Past 24 hours */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Did harp scan when the beam was back. The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).<br />
* Took production data with full target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117276Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T20:12:05Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Kondo entered the hall to work on PSC GEMs<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Took production data with full target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117272Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T18:57:20Z<p>Marianak: /* Past 24 hours */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Took production data with full target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117271Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T18:56:50Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
<br />
=== Plan ===<br />
* Continue taking production data with full target.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117270Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T18:49:58Z<p>Marianak: /* Shift Summary */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 15]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov15/16]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 16]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Do harp scan after the beam is back and take production data with full target.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117269Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T18:49:26Z<p>Marianak: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Do harp scan after the beam is back and take production data with full target.<br />
<br />
=Wednesday, November 16=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.<br />
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. need to be replaced when there are spare modules.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Do harp scan after the beam is back and take production data with full target.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117263Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T14:01:54Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.<br />
* Sasha installing chiller for led tungsten detector prototype.<br />
* Do harp scan after the beam is back and take production data with full target.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117260Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T13:47:54Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.<br />
* Mark and Malte will go into the hall to work on FCAL.<br />
* Beni will fill CDC bubblers<br />
* Physics electricians will enter hall to understand how to organize installment od FCAL2 eqipment.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117257Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T12:10:50Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm. Mark and Malte will go into the hall to work on FCAL.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117256Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T11:58:00Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
*Had a really smooth data taking throughout owl and early riser shifts.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for today from 6:45 am-2:45 pm. Mark and Malte will go into the hall to work on FCAL.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117255Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T11:54:42Z<p>Marianak: /* Shift Summary */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]<br />
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]<br />
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for today from 6:45 am-2:45 pm. Mark and Malte will go into the hall to work on FCAL.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117253Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T11:51:58Z<p>Marianak: /* Past 24 hours */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for today from 6:45 am-2:45 pm. Mark and Malte will go into the hall to work on FCAL.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117251Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T03:07:19Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for today from 6:45 am-2:45 pm. Mark and Malte will go into the hall to work on FCAL.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117250Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T03:00:45Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, beam/AC position changing a lot.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for today from 6:45 am-2:45 pm. Mark and Malte will go into the hall to work on FCAL.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117249Run Planning Meeting Noters, November 9- November 16, 20222022-11-15T02:24:56Z<p>Marianak: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.<br />
<br />
=Tuesday, November 15=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for today from 6:45 am-2:45 pm. Mark and Malte will go into the hall to work on FCAL.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117246Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T16:12:40Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* BCAL LED triggers turned on by Arshak during owl shift.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117245Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T14:51:59Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117242Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T13:17:02Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half (plan to finish around 2:45 pm).</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117241Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T13:16:52Z<p>Marianak: /* Plan */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half (plan to finish around 2:45).</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117240Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T13:12:26Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117239Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T12:47:34Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, problem with RF cavities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117238Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T12:01:30Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift thatCDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, problem with RF cavities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117237Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T12:00:50Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift thatCDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, problem with RF cavities. Didn't have beam for few hours. Also beam positions was oscillating, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know. <br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117236Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T11:56:31Z<p>Marianak: /* Monday, November 14 */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift thatCDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.7 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* Beam very unstable, problem with RF cavities. Didn't have beam for few hours.<br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117235Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T11:45:46Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift thatCDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
* Beam very unstable, problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117234Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T11:45:31Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift thatCDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
* No very unstable, problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117233Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T11:41:33Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift thatCDC bubbler BA901 was not bubbling, let Beni know. <br />
* BCAL LED triggers still off.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
* No beam from 10 am- due to problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117232Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T11:40:53Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* It was noticed during owl shift thatCDC bubbler BA901 was not bubbling, let Beni know. <br />
* Mark turned on BCAL LED triggers around.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
* No beam from 10 am- due to problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117231Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T11:39:57Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know. 2pm Beni says that the bubbler is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
* No beam from 10 am- due to problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117230Run Planning Meeting Noters, November 9- November 16, 20222022-11-14T11:37:16Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know. 2pm Beni says that the bubbler is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.<br />
* Mark turned on BCAL LED triggers around 2pm.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
No beam from 10 am- due to problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117227Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T18:16:59Z<p>Marianak: /* Sunday, November 13 */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know.<br />
* BCAL LED triggers still off, checking with Mark about it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
No beam from 10 am- due to problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117226Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T18:14:49Z<p>Marianak: /* Shift Summary */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know.<br />
* BCAL LED triggers still off, checking with Mark about it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 13 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 13]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov13/14]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 14]<br />
<br />
=== Issues/Reports ===<br />
No beam from 10 am- due to problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117225Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T18:14:18Z<p>Marianak: /* Monday, November 14 */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know.<br />
* BCAL LED triggers still off, checking with Mark about it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
No beam from 10 am- due to problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117224Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T18:12:25Z<p>Marianak: /* Sunday, November 13 */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 12 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 12]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov12/13]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 13]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know.<br />
* BCAL LED triggers still off, checking with Mark about it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
No beam from 10 am- due to problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117223Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T18:11:59Z<p>Marianak: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know.<br />
* BCAL LED triggers still off, checking with Mark about it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Monday, November 14=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
No beam from 10 am- due to problem with RF cavities.<br />
<br />
=== Plan ===<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117222Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T18:05:43Z<p>Marianak: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 1 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know.<br />
* BCAL LED triggers still off, checking with Mark about it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117221Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T17:36:42Z<p>Marianak: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 0.8 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.8 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know.<br />
* BCAL LED triggers still off, checking with Mark about it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117220Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T17:35:46Z<p>Marianak: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 0.8 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
<br />
<br />
<br />
=Sunday, November 13=<br />
=== Past 24 hours ===<br />
* Took production data with empty target.<br />
* Since yesterday we collected 0.8 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* CDC bubbler BA901 is not bubbling, let Beni know.<br />
* BCAL LED triggers still off, checking with Mark about it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117219Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T16:40:29Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on Full LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 0.8 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117218Run Planning Meeting Noters, November 9- November 16, 20222022-11-13T15:58:36Z<p>Marianak: /* Issues/Reports */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on Full LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 0.8 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h). This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianakhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Noters,_November_9-_November_16,_2022&diff=117217Run Planning Meeting Noters, November 9- November 16, 20222022-11-12T19:14:26Z<p>Marianak: /* Past 24 hours */</p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
=Thursday, November 10=<br />
=== Past 24 hours ===<br />
<br />
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.<br />
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.<br />
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]<br />
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]<br />
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]<br />
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]<br />
<br />
=== Issues/Reports ===<br />
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.<br />
* After the beam was back it was mostly stable besides some FSD trips.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday or Wednesday.<br />
<br />
=Friday, November 11=<br />
=== Past 24 hours ===<br />
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753). <br />
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]<br />
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]<br />
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]<br />
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]<br />
<br />
=== Issues/Reports ===<br />
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.<br />
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.<br />
<br />
=== Plan ===<br />
* Continue with Full target production.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.<br />
<br />
=Saturday, November 12=<br />
=== Past 24 hours ===<br />
* Took production data on Full LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.<br />
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449). <br />
Since yesterday we collected 0.8 B events.<br />
<br />
=== Shift Summary ===<br />
<br />
<br />
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]<br />
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]<br />
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]<br />
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]<br />
<br />
=== Issues/Reports ===<br />
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.<br />
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.<br />
<br />
=== Plan ===<br />
* Started empty target production when the beam was back.<br />
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.</div>Marianak