https://halldweb.jlab.org/wiki/api.php?action=feedcontributions&user=Sfegan&feedformat=atomGlueXWiki - User contributions [en]2024-03-29T13:20:30ZUser contributionsMediaWiki 1.24.1https://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115738Run Planning Meeting Notes, September 1 - September 7, 20222022-09-07T12:34:10Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Wednesday, September 7 =<br />
=== Past 24 hours ===<br />
* Zero field running at 200 nA and 100 nA<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4038646 Maintenance day, hall (eventually) in RESTRICTED access]<br />
<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4038635 0400-1000 07/09]<br />
** [https://logbooks.jlab.org/entry/4038565 2200-0400 06/09-07/09]<br />
** [https://logbooks.jlab.org/entry/4038522][https://logbooks.jlab.org/entry/4038534 1600-2200 06/09]<br />
** [https://logbooks.jlab.org/entry/4038353 1000-1600 06/09]<br />
** [https://logbooks.jlab.org/entry/4038256 0400-1000 06/09]<br />
<br />
=== Issues ===<br />
* MCC talked us out of a rate scan, next RC should clarify the maximum allowed current and/or whether any special conditions are required to go beyond 200 nA<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Complete target change and begin production running on Helium<br />
* Detector maintenance (ST, FCAL,...)<br />
* RC handover to Drew at 1:30pm<br />
<br />
= Tuesday, September 6 =<br />
=== Past 24 hours ===<br />
* Solenoid ramped down, CDC and FDC HV OFF<br />
* Zero field running<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4038256 0400-1000 06/09]<br />
** [https://logbooks.jlab.org/entry/4038201 2200-0400 05/09-06/09]<br />
** [https://logbooks.jlab.org/entry/4038074 1600-2200 05/09]<br />
** [https://logbooks.jlab.org/entry/4038029 1000-1600 05/09]<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4038194 Whiteboard camera not updating]<br />
* [https://logbooks.jlab.org/entry/4038191 Missing monitoring histograms]<br />
* [https://logbooks.jlab.org/entry/4038186 Alcohol bubbler low]<br />
* [https://logbooks.jlab.org/entry/4038181 Odd looking beam monitoring plots]<br />
* [https://logbooks.jlab.org/entry/4038142 Console 3]<br />
* Various lights in the counting room are fixed!<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Zero field running at 200 nA and 50 nA<br />
* Preparations for target change<br />
* Other work in hall during target change<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue Saturday-Sunday caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115737Run Planning Meeting Notes, September 1 - September 7, 20222022-09-07T12:33:22Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Wednesday, September 7 =<br />
=== Past 24 hours ===<br />
* Zero field running at 200 nA and 100 nA<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4038646 Maintenance day, hall (eventually) in RESTRICTED access]<br />
<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4038635 0400-1000 07/09]<br />
** [https://logbooks.jlab.org/entry/4038565 2200-0400 06/09-07/09]<br />
** [https://logbooks.jlab.org/entry/4038522][https://logbooks.jlab.org/entry/4038534 1600-2200 06/09]<br />
** [https://logbooks.jlab.org/entry/4038353 1000-1600 06/09]<br />
** [https://logbooks.jlab.org/entry/4038256 0400-1000 06/09]<br />
<br />
=== Issues ===<br />
* MCC talked us out of a rate scan, next RC should clarify the maximum allowed current and/or whether any special conditions are required to go beyond 200 nA<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Complete target change and begin production running on Helium<br />
* Detector maintenance (ST, FCAL,...)<br />
* RC handover<br />
<br />
= Tuesday, September 6 =<br />
=== Past 24 hours ===<br />
* Solenoid ramped down, CDC and FDC HV OFF<br />
* Zero field running<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4038256 0400-1000 06/09]<br />
** [https://logbooks.jlab.org/entry/4038201 2200-0400 05/09-06/09]<br />
** [https://logbooks.jlab.org/entry/4038074 1600-2200 05/09]<br />
** [https://logbooks.jlab.org/entry/4038029 1000-1600 05/09]<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4038194 Whiteboard camera not updating]<br />
* [https://logbooks.jlab.org/entry/4038191 Missing monitoring histograms]<br />
* [https://logbooks.jlab.org/entry/4038186 Alcohol bubbler low]<br />
* [https://logbooks.jlab.org/entry/4038181 Odd looking beam monitoring plots]<br />
* [https://logbooks.jlab.org/entry/4038142 Console 3]<br />
* Various lights in the counting room are fixed!<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Zero field running at 200 nA and 50 nA<br />
* Preparations for target change<br />
* Other work in hall during target change<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue Saturday-Sunday caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115736Run Planning Meeting Notes, September 1 - September 7, 20222022-09-06T18:06:34Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Wednesday, September 7 =<br />
=== Past 24 hours ===<br />
* Zero field running at 200 nA<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
* More details can be found here<br />
** [ 0400-1000 07/09]<br />
** [ 2200-0400 06/09-07/09]<br />
** [ 1600-2200 06/09]<br />
** [https://logbooks.jlab.org/entry/4038353 1000-1600 06/09]<br />
** [https://logbooks.jlab.org/entry/4038256 0400-1000 06/09]<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Complete target change and begin production running on Helium<br />
* RC handover<br />
<br />
= Tuesday, September 6 =<br />
=== Past 24 hours ===<br />
* Solenoid ramped down, CDC and FDC HV OFF<br />
* Zero field running<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4038256 0400-1000 06/09]<br />
** [https://logbooks.jlab.org/entry/4038201 2200-0400 05/09-06/09]<br />
** [https://logbooks.jlab.org/entry/4038074 1600-2200 05/09]<br />
** [https://logbooks.jlab.org/entry/4038029 1000-1600 05/09]<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4038194 Whiteboard camera not updating]<br />
* [https://logbooks.jlab.org/entry/4038191 Missing monitoring histograms]<br />
* [https://logbooks.jlab.org/entry/4038186 Alcohol bubbler low]<br />
* [https://logbooks.jlab.org/entry/4038181 Odd looking beam monitoring plots]<br />
* [https://logbooks.jlab.org/entry/4038142 Console 3]<br />
* Various lights in the counting room are fixed!<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Zero field running at 200 nA and 50 nA<br />
* Preparations for target change<br />
* Other work in hall during target change<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue Saturday-Sunday caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115731Run Planning Meeting Notes, September 1 - September 7, 20222022-09-06T12:35:09Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Tuesday, September 6 =<br />
=== Past 24 hours ===<br />
* Solenoid ramped down, CDC and FDC HV OFF<br />
* Zero field running<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4038256 0400-1000 06/09]<br />
** [https://logbooks.jlab.org/entry/4038201 2200-0400 05/09-06/09]<br />
** [https://logbooks.jlab.org/entry/4038074 1600-2200 05/09]<br />
** [https://logbooks.jlab.org/entry/4038029 1000-1600 05/09]<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4038194 Whiteboard camera not updating]<br />
* [https://logbooks.jlab.org/entry/4038191 Missing monitoring histograms]<br />
* [https://logbooks.jlab.org/entry/4038186 Alcohol bubbler low]<br />
* [https://logbooks.jlab.org/entry/4038181 Odd looking beam monitoring plots]<br />
* [https://logbooks.jlab.org/entry/4038142 Console 3]<br />
* Various lights in the counting room are fixed!<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Zero field running at 200 nA and 50 nA<br />
* Preparations for target change<br />
* Other work in hall during target change<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue Saturday-Sunday caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115730Run Planning Meeting Notes, September 1 - September 7, 20222022-09-06T11:44:11Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Tuesday, September 6 =<br />
=== Past 24 hours ===<br />
* Solenoid ramped down, CDC and FDC HV OFF<br />
* Zero field running<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4038256 0400-1000 06/09]<br />
** [https://logbooks.jlab.org/entry/4038201 2200-0400 05/09-06/09]<br />
** [https://logbooks.jlab.org/entry/4038074 1600-2200 05/09]<br />
** [https://logbooks.jlab.org/entry/4038029 1000-1600 05/09]<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4038194 Whiteboard camera not updating]<br />
* [https://logbooks.jlab.org/entry/4038191 Missing monitoring histograms]<br />
* [https://logbooks.jlab.org/entry/4038186 Alcohol bubbler low]<br />
* [https://logbooks.jlab.org/entry/4038181 Odd looking beam monitoring plots]<br />
* [https://logbooks.jlab.org/entry/4038142 Console 3]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Zero field running at 200 nA and 50 nA<br />
* Preparations for target change<br />
* Other work in hall during target change<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue Saturday-Sunday caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115729Run Planning Meeting Notes, September 1 - September 7, 20222022-09-06T03:40:29Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Tuesday, September 6 =<br />
=== Past 24 hours ===<br />
* Solenoid ramped down, CDC and FDC HV OFF<br />
* Zero field running<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
* More details can be found here<br />
** [ 0400-1000 06/09]<br />
** [https://logbooks.jlab.org/entry/4038201 2200-0400 05/09-06/09]<br />
** [https://logbooks.jlab.org/entry/4038074 1600-2200 05/09]<br />
** [https://logbooks.jlab.org/entry/4038029 1000-1600 05/09]<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4038194 Whiteboard camera not updating]<br />
* [https://logbooks.jlab.org/entry/4038191 Missing monitoring histograms]<br />
* [https://logbooks.jlab.org/entry/4038186 Alcohol bubbler low]<br />
* [https://logbooks.jlab.org/entry/4038181 Odd looking beam monitoring plots]<br />
* [https://logbooks.jlab.org/entry/4038142 Console 3]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Zero field running at 200 nA and 50 nA<br />
* Preparations for target change<br />
* Other work in hall during target change<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue Saturday-Sunday caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115728Run Planning Meeting Notes, September 1 - September 7, 20222022-09-05T19:43:58Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Tuesday, September 6 =<br />
=== Past 24 hours ===<br />
* Solenoid ramped down, CDC and FDC HV OFF<br />
* More details can be found here<br />
** [ 0400-1000 06/09]<br />
** [ 2200-0400 05/09-06/09]<br />
** [ 1600-2200 05/09]<br />
** [ 1000-1600 05/09]<br />
** [ 0400-1000 05/09]<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue Saturday-Sunday caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115727Run Planning Meeting Notes, September 1 - September 7, 20222022-09-05T13:16:22Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue Saturday-Sunday caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115726Run Planning Meeting Notes, September 1 - September 7, 20222022-09-05T12:58:14Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [https://logbooks.jlab.org/entry/4037947 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115725Run Planning Meeting Notes, September 1 - September 7, 20222022-09-05T03:17:26Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [ 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115724Run Planning Meeting Notes, September 1 - September 7, 20222022-09-05T03:16:47Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [ 0400-1000 05/09]<br />
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]<br />
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes.<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
* Solenoid ramp-down<br />
** CDC/FDC off<br />
* Zero field runs<br />
* Target change Wednesday<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115723Run Planning Meeting Notes, September 1 - September 7, 20222022-09-04T16:28:31Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* Some beam interruptions on Saturday while beam to Hall B was re-established<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [ 0400-1000 05/09]<br />
** [ 2200-0400 04/09-05/09]<br />
** [ 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes.<br />
* Changes to subsystem settings and configurations should be recorded in a separate logbook entry at the time they are applied. This helps shift crews to pin down the cause of any unexpected effects before calling the RC with a generic "there's somethng wrong with XYZ".<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
* Timekeeping, in person shift takers SHOULD ARRIVE IN TIME FOR THE START OF SHIFT, not 5-45 minutes after<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115722Run Planning Meeting Notes, September 1 - September 7, 20222022-09-04T16:23:40Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [ 0400-1000 05/09]<br />
** [ 2200-0400 04/09-05/09]<br />
** [ 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes.<br />
* Changes to subsystem settings and configurations should be recorded in a separate logbook entry at the time they are applied. This helps shift crews to pin down the cause of any unexpected effects before calling the RC with a generic "there's somethng wrong with XYZ".<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
* Timekeeping, in person shift takers SHOULD ARRIVE IN TIME FOR THE START OF SHIFT, not 5-45 minutes after<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115721Run Planning Meeting Notes, September 1 - September 7, 20222022-09-04T16:22:59Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
* Last 24 hours from logbook<br />
** [ 0400-1000 05/09]<br />
** [ 2200-0400 04/09-05/09]<br />
** [ 1600-2200 04/09]<br />
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes.<br />
* Changes to subsystem settings and configurations should be recorded in a separate logbook entry at the time they are applied. This helps shift crews to pin down the cause of any unexpected effects before calling the RC with a generic "there's somethng wrong".<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
* Timekeeping, in person shift takers SHOULD ARRIVE IN TIME FOR THE START OF SHIFT, not 5-45 minutes after<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115720Run Planning Meeting Notes, September 1 - September 7, 20222022-09-04T16:20:27Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes.<br />
* Changes to subsystem settings and configurations should be recorded in a separate logbook entry at the time they are applied. This helps shift crews to pin down the cause of any unexpected effects before calling the RC with a generic "there's somethng wrong".<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
* Timekeeping, in person shift takers SHOULD ARRIVE IN TIME FOR THE START OF SHIFT, not 5-45 minutes after<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115719Run Planning Meeting Notes, September 1 - September 7, 20222022-09-04T16:17:11Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL Voltage updates<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes. Change was poorly communicated to shift crews (and therefore RC). Changes to subsystem settings like this should be recorded in a separate logbook entry at the time they are applied, to aid the shift crews in pinning down any unexpected problems<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
* Timekeeping, in person shift takers SHOULD ARRIVE IN TIME FOR THE START OF SHIFT, not 5-45 minutes after<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115718Run Planning Meeting Notes, September 1 - September 7, 20222022-09-04T16:13:22Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
* TAGM [https://logbooks.jlab.org/entry/4037468 threshold] and [https://logbooks.jlab.org/entry/4037465 bias voltage] updates<br />
* FCAL <br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL voltage issue<br />
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT<br />
* Timekeeping, in person shift takers SHOULD ARRIVE IN TIME FOR THE START OF SHIFT, not 5-45 minutes after<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115717Run Planning Meeting Notes, September 1 - September 7, 20222022-09-04T16:05:02Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* 100 nA and 50 nA production runs<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]<br />
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL voltage issue<br />
* Remote connection to counting room<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]<br />
** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09]<br />
** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115716Run Planning Meeting Notes, September 1 - September 7, 20222022-09-03T15:22:10Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
=== Issues from the weekend ===<br />
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap]<br />
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Production Running on Be target at 100 nA<br />
* Trigger studies<br />
* Run details from logbook<br />
** [ 0400-1000 04/09]<br />
** [ 2200-0400 03/09-04/09]<br />
** [ 1600-2200 03/09]<br />
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09]<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target at 200 nA<br />
* Expecting minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09]<br />
** [https://logbooks.jlab.org/entry/4037267 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115713Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T20:36:38Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Run details from logbook<br />
** [ 0400-1000 04/09]<br />
** [ 2200-0400 03/09-04/09]<br />
** [ 1600-2200 03/09]<br />
** [ 1000-1600 03/09]<br />
** [ 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target<br />
* Minor updates to FCAL HV<br />
* Switch to 100 nA<br />
* Run details from logbook<br />
** [ 0400-1000 03/09]<br />
** [ 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115712Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T20:16:05Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Run details from logbook<br />
** [ 0400-1000 04/09]<br />
** [ 2200-0400 03/09-04/09]<br />
** [ 1600-2200 03/09]<br />
** [ 1000-1600 03/09]<br />
** [ 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Production Running on Be target<br />
* Run details from logbook<br />
** [ 0400-1000 03/09]<br />
** [ 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115711Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T20:15:24Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Run details from logbook<br />
** [ 0400-1000 04/09]<br />
** [ 2200-0400 03/09-04/09]<br />
** [ 1600-2200 03/09]<br />
** [ 1000-1600 03/09]<br />
** [ 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Run details from logbook<br />
** [ 0400-1000 03/09]<br />
** [ 2200-0400 02/09-03/09]<br />
** [https://logbooks.jlab.org/entry/4037168 1600-2200 02/09]<br />
** [https://logbooks.jlab.org/entry/4037046 1000-1600 02/09]<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115710Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T20:12:46Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
* Run details from logbook<br />
** [ 0400-1000 04/09]<br />
** [ 2200-0400 03/09-04/09]<br />
** [ 1600-2200 03/09]<br />
** [ 1000-1600 03/09]<br />
** [ 0400-1000 03/09]<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
* Run details from logbook<br />
** [ 0400-1000 03/09]<br />
** [ 2200-0400 02/09-03/09]<br />
** [ 1600-2200 02/09]<br />
** [ 1000-1600 02/09]<br />
** [ 0400-1000 02/09]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115709Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T20:09:04Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9.30am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115708Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T15:21:21Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
* [https://logbooks.jlab.org/entry/4037041 Missing RootSpy plots found]<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115707Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T15:16:01Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Monday, September 5 =<br />
=== Labor Day Holiday Special (9am, note one-off different time) ===<br />
=== Weekend Run Updates ===<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === <br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115705Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T13:24:35Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Sunday, September 4 =<br />
* No Meeting<br />
<br />
= Saturday, September 3 =<br />
* No Meeting<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115703Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T12:36:42Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* Shift crew just reported that Ar and CO2 cylinders are low<br />
* DAQ issues late night<br />
* Hydra very slow updating last night (>10,000 seconds)<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115702Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T11:38:41Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* DAQ issues late night<br />
* Hydra not updating?<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115701Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T11:36:30Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036917 0400-1000 02/09]<br />
** [https://logbooks.jlab.org/entry/4036854 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* DAQ issues late night<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115699Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T03:24:22Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [ 0400-1000 02/09]<br />
** [ 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* DAQ issues late night<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
* Solenoid ramp down Monday, zero field runs Tuesday<br />
* Target change intended for Wednesday<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115698Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T03:15:37Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [ 0400-1000 02/09]<br />
** [ 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* DAQ issues late night<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115697Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T03:13:30Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [ 0400-1000 02/09]<br />
** [ 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* DAQ issues<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
* Access needed to restore target comms<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115696Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T03:12:42Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036504 CDC AI is online!]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [ 0400-1000 02/09]<br />
** [ 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* DAQ issues<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115695Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T03:01:55Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [ 0400-1000 02/09]<br />
** [ 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)<br />
* Trigger Studies<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115694Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T02:48:45Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run]<br />
* [https://logbooks.jlab.org/entry/4036829 FCAL HV Scan]<br />
* More details can be found here<br />
** [ 0400-1000 02/09]<br />
** [ 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115693Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T02:00:55Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
<br />
* More details can be found here<br />
** [ 0400-1000 02/09]<br />
** [ 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115692Run Planning Meeting Notes, September 1 - September 7, 20222022-09-02T01:59:42Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Friday, September 2 =<br />
=== Past 24 hours ===<br />
<br />
* More details can be found here<br />
** [ 0400-1000 02/09]<br />
** [ 2200-0400 01/09-02/09]<br />
** [https://logbooks.jlab.org/entry/4036628 1600-2200 01/09]<br />
** [https://logbooks.jlab.org/entry/4036508 1000-1600 01/09]<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
* Overnight production running at 200 nA<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* [https://logbooks.jlab.org/entry/4036299 Production on Be target (Sasha)]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115679Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T12:44:17Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115678Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T12:39:38Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
* No charger for the RC phone, currently at 71%<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Further Information]<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115677Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T12:37:34Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* [https://logbooks.jlab.org/entry/4036440 RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run]<br />
* No charger for the RC phone, currently at 71%<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Intensity scan?<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115676Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T12:23:02Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
* No charger for the RC phone?<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115675Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T12:16:38Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Trigger study (Sasha)<br />
* Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
* Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115674Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T12:15:31Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
* Overnight production running at 200 nA<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
** Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
** Trigger study (Sasha)<br />
** Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
** Physics production<br />
** Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115673Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T12:11:43Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
* 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). [https://logbooks.jlab.org/entry/4035569 logbook 403559]<br />
* Thanks to Thomas HYDRA is now working also.<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector<br />
* Take data with B-field<br />
** Trigger study (Sasha)<br />
** Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
** Physics production<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Coordination_Meetings:Fall2022&diff=115669Run Coordination Meetings:Fall20222022-09-01T11:57:02Z<p>Sfegan: </p>
<hr />
<div>===Fall 2022 Run===<br />
<br />
'''PrimEx experiment (August 27 - December 19)'''<br />
<br />
== Meeting General Agenda ==<br />
<br />
Run planning meetings:<br />
<br />
[[Run Planning Meeting Notes, September 1 - September 7, 2022]]<br />
<br />
[[Run Planning Meeting Notes, August 25 - August 31, 2022]]<br />
<br />
[[Run Planning Meeting Notes, August 18 - August 24, 2022]]<br />
<br />
==Connect Information==<br />
<br />
To connect from the outside by phone please do the following<br />
<br />
1.) To join via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] Meeting ID: 160 199 0060 / Passcode 8394<br />
<br />
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 660743227.<br />
<br />
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.<br />
<br />
4.) The moderator code is <font color="red">8394</font><br />
<br />
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada<br />
<br />
Specific instructions for connecting from JLab's Hall D conference room:<br />
<br />
*Turn polycon on if necessary (do it before turning the computer on)<br />
*With the polycon, place a call at 199.48.152.152<br />
*Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #<br />
*You may have to unmute the microphone: #*4<br />
*Turn the computer on if needed<br />
<br />
==Beam and Hall configuration==<br />
<br />
* Beam energy expected:<br />
** 11.57 GeV <br />
* Solenoid:<br />
** 1350 A<br />
* CW Beam: <br />
** 250 MHz frequency<br />
** 50 - 200 nA (production runs), 400 nA maximum (rate scans), < 5 nA during calibration runs<br />
* Radiators: <br />
**Goniometer radiators: <br />
**Amorphous: <br />
*** 10 µm Al (11.2·10-5 R.L.)<br />
*** 1.64 µm Al (1.86·10-5 R.L.) calibration <br />
*Tagger quadrupole on (-4.2 A). <br />
* Collimator hole: Default running: 5.0 mm.<br />
* Targets: <br />
** 4He target: cryogenic target<br />
** Be target<br />
* PS magnet:<br />
** 850 A<br />
* PS converter: 750 μm<br />
<br />
* Miscellaneous:<br />
** PS test area:<br />
***Right arm: Setup to check PbWO4 crystals and calorimeter modules / prototypes<br />
<br />
==General Information==<br />
<br />
This document describes the run plan for the Hall D Fall 2022 run. <br />
* Schedule for the run:<br />
# August 18 - August 26 (change detector configuration from CPP to PrimEx)<br />
# August 27: beam restoration<br />
# December 19 (7 am): end of the run<br />
<br />
* Accelerator overall plan and priorities:<br />
<br />
*Hall D plan<br />
**Experiment: <br />
** PrimEx<br />
** 2 TAC Runs<br />
** Empty Target Runs<br />
<br />
* Expected Staffing and responsibilities: <br />
**The Run Coordinator oversees the run: <br />
*** August 18 - August 23: 14 days: Liping Gan (detector configuration change)<br />
*** August 24 - August 30: 14 days: Igal Jaegle (detector configuration, accelerator restoration)<br />
*** August 31 - September 6: Stuart Fegan <br />
*** September 7 - September 13: TDB<br />
*** September 14 - September 20: Arshak Asaturyan<br />
*** September 21 - September 27: Igal Jaegle<br />
*** September 28 - October 4: TBD<br />
*** October 5 - October 11: Joerg Reinhold<br />
*** October 12 - October 18: TBD<br />
*** October 19 - October 25: Arshak Asaturyan<br />
*** October 26 - November 1: TBD<br />
*** November 2 - November 8: Olga Cortes Becerra<br />
*** November 9 - November 15: Mariana Khachatryan<br />
*** November 16 - November 22: TDB<br />
*** November 23 - November 29: TDB<br />
*** November 30 - December 6: TBD<br />
*** December 7 - December 13: TBD<br />
*** December 14 - December 20: TBD<br />
*** (Last day of Primex running December 19)<br />
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDL is:<br />
***PDL: Lubomir Penchev<br />
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data. <br />
**Shifts: 2 person shifts: 1 local leader and 1 (optionally remote) worker scheduled through [https://www.jlab.org/Hall-D/shifts/index.php the GlueX shift scheduler].<br />
<br />
* Coordination Activities:<br />
** The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.<br />
** Run meetings: broadcasted on Bluejeans. 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting. <br />
*** Start of run: Daily meetings<br />
*** Production: <font color="blue"> Alternate nominal length meetings (Monday/Thursday) with short meetings (Tuesday, Wednesday, Friday) </font><br />
<br />
* Useful links:<br />
**Accelerator schedule and information<br />
***[https://www.jlab.org/exp_prog/experiment_schedule/2018/20181108.2.pdf Long term schedule]<br />
***[https://accweb.acc.jlab.org/calendar/ Scheduled Accelerator Down (SAD)/Maintenance Calendar]<br />
***[http://accboard.acc.jlab.org/ http://accboard.acc.jlab.org/] <br />
***[https://accweb.acc.jlab.org/presenter/pd-menu? PD weekly summary (also available from Accelerator's ELOG)]<br />
**Link to Richard Jones program to plot the beam profile at the collimator.<br />
***[http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi Harp extrapolation tool]<br />
**[https://halldweb.jlab.org/wiki/index.php/List_Run_Coordination_Meetings Links to previous runplans]<br />
**Web-accessible EPICS information <br />
***[https://epicsweb.jlab.org/wedm/screen?edl=%2fcs%2fopshome%2fedm%2fdsg%2fhall_d%2foverview%2fgluex.edl Hall D EPICS summary screen from CSS]<br />
***[https://epicsweb.jlab.org/wedm/screen?edl=/cs/opshome/edm/wall/Status_W_Accel.edl Accelerator summary screen from CSS]<br />
***[https://epicsweb.jlab.org/wmenu/#HallDDetectorComponents-page Hall D detectors related EPICS screens]<br />
***[https://epicsweb.jlab.org/wmenu/#HallDMenu-page Hall D related accelerator screens epicsweb page]<br />
** Links to beam parameters/radiation level monitoring:<br />
***[https://www.jlab.org/accel/RadCon/opsgraphs/8h/halld_8h.pdf Last 8-hours plots showing 1-minute, 10-minute, and hourly averages] <br />
***[https://www.jlab.org/accel/RadCon/opsgraphs/24h/halld_24h.pdf Same but Last 24-hours] <br />
***[https://www.jlab.org/accel/RadCon/opsgraphs/72h/halld_72h.pdf Same but Last 72-hours]<br />
***Week, month, and quarter (3 months) plots also exist, with similar web addresses.<br />
*** A map of the radiation monitors [[File:Location_detect2.jpg | 100px]]<br />
<br />
== Runplan ==<br />
<br />
[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Run Plan, Fall 2022]<br />
<br />
== Hall D situation room (current run plan) ==<br />
<br />
[https://halldweb.jlab.org/hdops/wiki/index.php/Short_Term_Run_Plan Short Term Run Plan (To be updated)]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board camera]<br />
<br />
== Runplan time charts==<br />
<br />
'''Fall 2022 time charts''':<br />
<br />
[[PrimEx-eta Short Term Run Plan]]<br />
<br />
==Accelerator status ==<br />
#* [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule (White board)]<br />
#* [https://cebaf.jlab.org/calendar/ Link to accelerator SAD calendar]<br />
#* 07:45 M-F PD/RC meeting [https://jlab-org.zoomgov.com/j/1611456010?pwd=d2RJWTJQRDM0ZkNaZ1dpTmtLWDAwQT09 zoom]<br />
#* 08:00 M-F & 13:30 Wed MCC mettings [https://jlab-org.zoomgov.com/j/1601304841?pwd=Z1RIOVVUdkdXL2R2LzREZUNOUlh1dz09 zoom]<br />
<br />
== Setting Up Photon Beam ==<br />
<br />
<!--<font color="red"> TBD </font>--><br />
#Verify electron beam quality and establish photon beam<br />
#*<b>Ion Chambers trip threshold must be set using 3 Al. radiators on the amorphous radiator ladder</b><br />
#*Tune electron beam with radiator retracted <br />
#**<b>Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position. </b><br />
#***Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)<br />
#****RAD102_P1 <span style="color:#ff00ff">~ 10 mrad/hr</span> (tagger area, gammas, between tagger and dump)<br />
#****RAD102_P2 <span style="color:#ff00ff">~30 mrad/hr</span> (tagger area, gammas, on the ground below the goniometer). <br />
#****RAD102_P3 <span style="color:#ff00ff">~ 0.3 mrem/hr</span> (tagger area, neutrons, near electronics racks) <br />
#****RAD508_P1 <span style="color:#ff00ff">< 0.1 mrad/hr</span> (collimator cave, gammas). <br />
#****RAD508_P2 <span style="color:#ff00ff">~ 0. mrad/hr</span> (Hall. Neutrons). <br />
#*Establish good photon beam <br />
#* Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is in power/beam permit.)<br />
#**Insert 2*10<sup>-5</sup> RL radiator. <b><font color="red">Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved</font></b><br />
#*** Typical levels are (for 2×10<sup>-5</sup> radiator, electron beam current 50 nA)<br />
#****RAD102_P1= <span style="color:#ff00ff">35 mrad/hr</span> (tagger area, gammas, between tagger and dump)<br />
#****RAD102_P2= <span style="color:#ff00ff">~ 50 mrad/hr</span> (tagger area, gammas, on the ground below the goniometer) <br />
#****RAD102_P3= <span style="color:#ff00ff"> ~2 mrem/hr</span> (tagger area, neutrons, near electronics racks)<br />
#****RAD508_P1= <span style="color:#ff00ff">~10 mrad/hr</span> (collimator cave, gammas).<br />
#****RAD508_P2 <span style="color:#ff00ff">< ~ 0. mrad/hr</span> (Hall. Neutrons). <br />
#*Verify beam position and envelope (Hovanes).<br />
#**Ask MCC to set beam position on 5C11b to x=-0.5 mm and y=+1.0 mm.<br />
#**Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan see instruction]. If it looks good, proceed to next step. Otherwise, inform MCC.<br />
#**Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10<sup>-4</sup> radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.<br />
#*Radiation level study (1h, collimator at 5mm):<br />
#**Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA. There is need to run the DAQ or stop the beam between each steps: the data are recorded by EPICS. However, the beam need to be off when moving to a different radiator for the next steps. <br />
#**Run 5 min with the 10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA <br />
#**Run 3 min with the 3*10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA <br />
#* Photon flux optimization and Active Collimator calibration. Call Hovanes.<br />
#**re-Insert the 10<sup>-4</sup> radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.<br />
#**Determine maximum photon beam transmission by doing 2D scans using the collimator x/y motions (Hovanes. 1h)<br />
#** Repeat procedure with 2*10<sup>-5</sup> radiator (Call MCC) and 50 nA beam current. This will provide the Act. Col. nominal positions for its low gain values.<br />
#**Record on the white board what is the beam position on 5C11b and Active Collimator for optimal photon transmission, both for low and high Act. Col. gain.<br />
#**Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.<br />
<br />
==Hot Checkout ==<br />
<span style="color:red">'''To be completed by XXX.''' </span><br />
* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status] ( [https://cebaf.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status (off site test version)]) <br />
<span style="color:green"> 100% ready </span>; <span style="color:#BABC3A">0% checked </span>; <span style="color:red">0% not ready </span><br />
<br />
==Readiness for Fall 2022 Run ==<br />
[https://halldweb.jlab.org/primexd/run_plan/Primex_Install_after_CPPv3.pdf Detector configuration plan]<br />
<!--(This section is commented out for clarity) --><br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF syrvey <br />
** ST syrvey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector environmental controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber<br />
* RSAD and ESAD Safety documents, to be updated (Lubomir):<br />
** [http://www.jlab.org/Hall-D/detector/fdc/documents/RSAD-05.19.2022-HD-CPP_PRIMEX_ja.pdf RSAD]<br />
** [http://www.jlab.org/Hall-D/detector/fdc/documents/Primex/HallD_ESAD.pdf ESAD]<br />
** [http://www.jlab.org/Hall-D/detector/fdc/documents/Primex/COO.pdf COO]<br />
** [http://www.jlab.org/Hall-D/detector/fdc/documents/Primex/HallD_ERG.pdf ERG]<br />
** Documents approved and ready for shift takers to sign. <br />
*Phones <br />
**System experts should have found their on-call phones by now.<br />
**System experts should have their phone charged. <br />
**<font color="red">System experts should start carrying their (charged) phone.</font> <br />
*Hall Status/safety (Mark/Tim)<br />
*Other topics?<br />
<br />
== Live Camera Feeds from the Four Counting Houses ==<br />
# These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses.<br />
# Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.<br />
<br />
== Running Shifts Remote ==<br />
* [[Remote shift concepts]]</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Coordination_Meetings:Fall2022&diff=115668Run Coordination Meetings:Fall20222022-09-01T11:56:31Z<p>Sfegan: </p>
<hr />
<div>===Fall 2022 Run===<br />
<br />
'''PrimEx experiment (August 27 - December 19)'''<br />
<br />
== Meeting General Agenda ==<br />
<br />
Run planning meetings:<br />
<br />
[[Run Planning Meeting Notes, September 1 - September 7, 2022]]<br />
<br />
[[Run Planning Meeting Notes, August 25 - August 31, 2022]]<br />
<br />
[[Run Planning Meeting Notes, August 18 - August 24, 2022]]<br />
<br />
==Connect Information==<br />
<br />
To connect from the outside by phone please do the following<br />
<br />
1.) To join via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] Meeting ID: 160 199 0060 / Passcode 8394<br />
<br />
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 660743227.<br />
<br />
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.<br />
<br />
4.) The moderator code is <font color="red">8394</font><br />
<br />
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada<br />
<br />
Specific instructions for connecting from JLab's Hall D conference room:<br />
<br />
*Turn polycon on if necessary (do it before turning the computer on)<br />
*With the polycon, place a call at 199.48.152.152<br />
*Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #<br />
*You may have to unmute the microphone: #*4<br />
*Turn the computer on if needed<br />
<br />
==Beam and Hall configuration==<br />
<br />
* Beam energy expected:<br />
** 11.57 GeV <br />
* Solenoid:<br />
** 1350 A<br />
* CW Beam: <br />
** 250 MHz frequency<br />
** 50 - 200 nA (production runs), 400 nA maximum (rate scans), < 5 nA during calibration runs<br />
* Radiators: <br />
**Goniometer radiators: <br />
**Amorphous: <br />
*** 10 µm Al (11.2·10-5 R.L.)<br />
*** 1.64 µm Al (1.86·10-5 R.L.) calibration <br />
*Tagger quadrupole on (-4.2 A). <br />
* Collimator hole: Default running: 5.0 mm.<br />
* Targets: <br />
** 4He target: cryogenic target<br />
** Be target<br />
* PS magnet:<br />
** 850 A<br />
* PS converter: 750 μm<br />
<br />
* Miscellaneous:<br />
** PS test area:<br />
***Right arm: Setup to check PbWO4 crystals and calorimeter modules / prototypes<br />
<br />
==General Information==<br />
<br />
This document describes the run plan for the Hall D Fall 2022 run. <br />
* Schedule for the run:<br />
# August 18 - August 26 (change detector configuration from CPP to PrimEx)<br />
# August 27: beam restoration<br />
# December 19 (7 am): end of the run<br />
<br />
* Accelerator overall plan and priorities:<br />
<br />
*Hall D plan<br />
**Experiment: <br />
** PrimEx<br />
** 2 TAC Runs<br />
** Empty Target Runs<br />
<br />
* Expected Staffing and responsibilities: <br />
**The Run Coordinator oversees the run: <br />
*** August 18 - August 23: 14 days: Liping Gan (detector configuration change)<br />
*** August 24 - August 30: 14 days: Igal Jaegle (detector configuration, accelerator restoration)<br />
*** August 31 - September 6: Stuart Fegan <br />
*** September 7 - September 13: TDB<br />
*** September 14 - September 20: Arshak Asaturyan<br />
*** September 21 - September 27: Igal Jaegle<br />
*** September 28 - October 4: TBD<br />
*** October 5 - October 11: Joerg Reinhold<br />
*** October 12 - October 18: TBD<br />
*** October 19 - October 25: Arshak Asaturyan<br />
*** October 26 - November 1: TBD<br />
*** November 2 - November 8: Olga Cortes Becerra<br />
*** November 9 - November 15: Mariana Khachatryan<br />
*** November 16 - November 22: TDB<br />
*** November 23 - November 29: TDB<br />
*** November 30 - December 6: TBD<br />
*** December 7 - December 13: TBD<br />
*** December 14 - December 20: TBD<br />
*** (Last day of Primex running December 19)<br />
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDL is:<br />
***PDL: Lubomir Penchev<br />
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data. <br />
**Shifts: 2 person shifts: 1 local leader and 1 (optionally remote) worker scheduled through [https://www.jlab.org/Hall-D/shifts/index.php the GlueX shift scheduler].<br />
<br />
* Coordination Activities:<br />
** The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.<br />
** Run meetings: broadcasted on Bluejeans. 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting. <br />
*** Start of run: Daily meetings<br />
*** Production: <font color="blue"> Alternate nominal length meetings (Monday/Thursday) with short meetings (Tuesday, Wednesday, Friday) </font><br />
<br />
* Useful links:<br />
**Accelerator schedule and information<br />
***[https://www.jlab.org/exp_prog/experiment_schedule/2018/20181108.2.pdf Long term schedule]<br />
***[https://accweb.acc.jlab.org/calendar/ Scheduled Accelerator Down (SAD)/Maintenance Calendar]<br />
***[http://accboard.acc.jlab.org/ http://accboard.acc.jlab.org/] <br />
***[https://accweb.acc.jlab.org/presenter/pd-menu? PD weekly summary (also available from Accelerator's ELOG)]<br />
**Link to Richard Jones program to plot the beam profile at the collimator.<br />
***[http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi Harp extrapolation tool]<br />
**[https://halldweb.jlab.org/wiki/index.php/List_Run_Coordination_Meetings Links to previous runplans]<br />
**Web-accessible EPICS information <br />
***[https://epicsweb.jlab.org/wedm/screen?edl=%2fcs%2fopshome%2fedm%2fdsg%2fhall_d%2foverview%2fgluex.edl Hall D EPICS summary screen from CSS]<br />
***[https://epicsweb.jlab.org/wedm/screen?edl=/cs/opshome/edm/wall/Status_W_Accel.edl Accelerator summary screen from CSS]<br />
***[https://epicsweb.jlab.org/wmenu/#HallDDetectorComponents-page Hall D detectors related EPICS screens]<br />
***[https://epicsweb.jlab.org/wmenu/#HallDMenu-page Hall D related accelerator screens epicsweb page]<br />
** Links to beam parameters/radiation level monitoring:<br />
***[https://www.jlab.org/accel/RadCon/opsgraphs/8h/halld_8h.pdf Last 8-hours plots showing 1-minute, 10-minute, and hourly averages] <br />
***[https://www.jlab.org/accel/RadCon/opsgraphs/24h/halld_24h.pdf Same but Last 24-hours] <br />
***[https://www.jlab.org/accel/RadCon/opsgraphs/72h/halld_72h.pdf Same but Last 72-hours]<br />
***Week, month, and quarter (3 months) plots also exist, with similar web addresses.<br />
*** A map of the radiation monitors [[File:Location_detect2.jpg | 100px]]<br />
<br />
== Runplan ==<br />
<br />
[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Run Plan, Fall 2022]<br />
<br />
== Hall D situation room (current run plan) ==<br />
<br />
[https://halldweb.jlab.org/hdops/wiki/index.php/Short_Term_Run_Plan Short Term Run Plan (To be updated)]<br />
[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf General Run Plan]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board camera]<br />
<br />
== Runplan time charts==<br />
<br />
'''Fall 2022 time charts''':<br />
<br />
[[PrimEx-eta Short Term Run Plan]]<br />
<br />
==Accelerator status ==<br />
#* [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule (White board)]<br />
#* [https://cebaf.jlab.org/calendar/ Link to accelerator SAD calendar]<br />
#* 07:45 M-F PD/RC meeting [https://jlab-org.zoomgov.com/j/1611456010?pwd=d2RJWTJQRDM0ZkNaZ1dpTmtLWDAwQT09 zoom]<br />
#* 08:00 M-F & 13:30 Wed MCC mettings [https://jlab-org.zoomgov.com/j/1601304841?pwd=Z1RIOVVUdkdXL2R2LzREZUNOUlh1dz09 zoom]<br />
<br />
== Setting Up Photon Beam ==<br />
<br />
<!--<font color="red"> TBD </font>--><br />
#Verify electron beam quality and establish photon beam<br />
#*<b>Ion Chambers trip threshold must be set using 3 Al. radiators on the amorphous radiator ladder</b><br />
#*Tune electron beam with radiator retracted <br />
#**<b>Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position. </b><br />
#***Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)<br />
#****RAD102_P1 <span style="color:#ff00ff">~ 10 mrad/hr</span> (tagger area, gammas, between tagger and dump)<br />
#****RAD102_P2 <span style="color:#ff00ff">~30 mrad/hr</span> (tagger area, gammas, on the ground below the goniometer). <br />
#****RAD102_P3 <span style="color:#ff00ff">~ 0.3 mrem/hr</span> (tagger area, neutrons, near electronics racks) <br />
#****RAD508_P1 <span style="color:#ff00ff">< 0.1 mrad/hr</span> (collimator cave, gammas). <br />
#****RAD508_P2 <span style="color:#ff00ff">~ 0. mrad/hr</span> (Hall. Neutrons). <br />
#*Establish good photon beam <br />
#* Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is in power/beam permit.)<br />
#**Insert 2*10<sup>-5</sup> RL radiator. <b><font color="red">Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved</font></b><br />
#*** Typical levels are (for 2×10<sup>-5</sup> radiator, electron beam current 50 nA)<br />
#****RAD102_P1= <span style="color:#ff00ff">35 mrad/hr</span> (tagger area, gammas, between tagger and dump)<br />
#****RAD102_P2= <span style="color:#ff00ff">~ 50 mrad/hr</span> (tagger area, gammas, on the ground below the goniometer) <br />
#****RAD102_P3= <span style="color:#ff00ff"> ~2 mrem/hr</span> (tagger area, neutrons, near electronics racks)<br />
#****RAD508_P1= <span style="color:#ff00ff">~10 mrad/hr</span> (collimator cave, gammas).<br />
#****RAD508_P2 <span style="color:#ff00ff">< ~ 0. mrad/hr</span> (Hall. Neutrons). <br />
#*Verify beam position and envelope (Hovanes).<br />
#**Ask MCC to set beam position on 5C11b to x=-0.5 mm and y=+1.0 mm.<br />
#**Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan see instruction]. If it looks good, proceed to next step. Otherwise, inform MCC.<br />
#**Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10<sup>-4</sup> radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.<br />
#*Radiation level study (1h, collimator at 5mm):<br />
#**Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA. There is need to run the DAQ or stop the beam between each steps: the data are recorded by EPICS. However, the beam need to be off when moving to a different radiator for the next steps. <br />
#**Run 5 min with the 10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA <br />
#**Run 3 min with the 3*10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA <br />
#* Photon flux optimization and Active Collimator calibration. Call Hovanes.<br />
#**re-Insert the 10<sup>-4</sup> radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.<br />
#**Determine maximum photon beam transmission by doing 2D scans using the collimator x/y motions (Hovanes. 1h)<br />
#** Repeat procedure with 2*10<sup>-5</sup> radiator (Call MCC) and 50 nA beam current. This will provide the Act. Col. nominal positions for its low gain values.<br />
#**Record on the white board what is the beam position on 5C11b and Active Collimator for optimal photon transmission, both for low and high Act. Col. gain.<br />
#**Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.<br />
<br />
==Hot Checkout ==<br />
<span style="color:red">'''To be completed by XXX.''' </span><br />
* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status] ( [https://cebaf.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status (off site test version)]) <br />
<span style="color:green"> 100% ready </span>; <span style="color:#BABC3A">0% checked </span>; <span style="color:red">0% not ready </span><br />
<br />
==Readiness for Fall 2022 Run ==<br />
[https://halldweb.jlab.org/primexd/run_plan/Primex_Install_after_CPPv3.pdf Detector configuration plan]<br />
<!--(This section is commented out for clarity) --><br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF syrvey <br />
** ST syrvey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector environmental controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber<br />
* RSAD and ESAD Safety documents, to be updated (Lubomir):<br />
** [http://www.jlab.org/Hall-D/detector/fdc/documents/RSAD-05.19.2022-HD-CPP_PRIMEX_ja.pdf RSAD]<br />
** [http://www.jlab.org/Hall-D/detector/fdc/documents/Primex/HallD_ESAD.pdf ESAD]<br />
** [http://www.jlab.org/Hall-D/detector/fdc/documents/Primex/COO.pdf COO]<br />
** [http://www.jlab.org/Hall-D/detector/fdc/documents/Primex/HallD_ERG.pdf ERG]<br />
** Documents approved and ready for shift takers to sign. <br />
*Phones <br />
**System experts should have found their on-call phones by now.<br />
**System experts should have their phone charged. <br />
**<font color="red">System experts should start carrying their (charged) phone.</font> <br />
*Hall Status/safety (Mark/Tim)<br />
*Other topics?<br />
<br />
== Live Camera Feeds from the Four Counting Houses ==<br />
# These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses.<br />
# Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.<br />
<br />
== Running Shifts Remote ==<br />
* [[Remote shift concepts]]</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115667Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T11:42:39Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [https://logbooks.jlab.org/entry/4036342 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036326 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Take data with B-field<br />
** Trigger study (Sasha)<br />
** Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
** Physics production<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115666Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T03:15:36Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [ 0400-1000 01/09]<br />
** [https://logbooks.jlab.org/entry/4036302 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Take data with B-field<br />
** Trigger study (Sasha)<br />
** Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
** Physics production<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />
*** Remove inner acrylic absorber</div>Sfeganhttps://halldweb.jlab.org/wiki/index.php?title=Run_Planning_Meeting_Notes,_September_1_-_September_7,_2022&diff=115665Run Planning Meeting Notes, September 1 - September 7, 20222022-09-01T02:39:30Z<p>Sfegan: </p>
<hr />
<div>Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)<br />
<br />
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]<br />
<br />
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]<br />
<br />
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]<br />
<br />
Back to [[Run Coordination Meetings:Fall2022]]<br />
<br />
= Thursday, September 1 =<br />
=== Past 24 hours ===<br />
* Be target inserted<br />
* [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca)<br />
* Electric work<br />
** AC & SC Electronics (Nick)<br />
* [https://logbooks.jlab.org/entry/4036260 Target alarms temporarily disabled]<br />
* [https://logbooks.jlab.org/entry/4036245], [https://logbooks.jlab.org/entry/4036247], [https://logbooks.jlab.org/entry/4036250] Active Collimator studies<br />
* [https://logbooks.jlab.org/entry/4036282 AC calibration, new lock positions]<br />
* More details can be found here<br />
** [ 0400-1000 01/09]<br />
** [ 2200-0400 31/08-01/09]<br />
** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08]<br />
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08]<br />
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]<br />
<br />
=== Issues ===<br />
* [https://logbooks.jlab.org/entry/4036296 FDC and CDC alarms]<br />
<br />
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===<br />
* Take data with B-field<br />
** Trigger study (Sasha)<br />
** Detector checkout (raw mode for ADCs & pi0 for FCAL)<br />
** Physics production<br />
<br />
=The hot checkout page= <br />
*[https://accweb.acc.jlab.org/hco Hot checkout]<br />
<br />
= Readiness Check List=<br />
*Solenoid (Eugene/Beni)<br />
**Start the run with magnetic field on<br />
<br />
*Surveys (Tim/Mark)<br />
** FCAL survey <br />
** TOF survey <br />
** ST survey <br />
** TAGM<br />
** TAGH<br />
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)<br />
** Survey CCAL after it's installed in the Hall<br />
*DAQ (Sergei). <br />
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. <br />
*Trigger (Alex S.) <br />
** Check physics triggers<br />
** Run CCAL trigger when the detector is installed in the Hall<br />
** Connect / check CCAL LED and alpha triggers <br />
*Beam line <br />
** Install He beam pipe between FCAL and CCAL (Tim)<br />
** Install led shielding wall in front downstream the PS (Tim) <br />
** Radiator status<br />
*** Check amorphous radiator <br />
** Tagger hodoscope (A. Somov)<br />
*** Install plates with TAGH counters<br />
*** Install / check repaired TAGH countes<br />
**Tagger microscope (Tim / Richard Jones)<br />
*** Move TAGM to the new location and rotate <br />
**Collimator Motion (Hovanes)<br />
*** Not changed<br />
**Active collimator detectors(Richard Jones/Alexandre Deur)<br />
*** Move active collimator to 5 mm hole<br />
*** Check<br />
**Profiler (Hovanes)<br />
*** Not changed<br />
**Luminosity monitor (Hovanes)<br />
*** Not changed<br />
**Halo monitors<br />
*** Not changed <br />
**PS system (Alex Somov) <br />
*** Not changed<br />
**Beam line magnets (PS magnet sweeping magnet and tagger quads).<br />
*** Change filed of the PS magnet<br />
**Polarimeter (Sebastian Cole/M. Dugger) <br />
*** Optional, not used in PrimEx<br />
** Targets (Chris/Tim/Alexandre D.) <br />
*** LH4<br />
*** Be <br />
**TAC (Alex Somov/Hovanes)<br />
*** Use CCAL (TAC can be used as a backup)<br />
**Slow control (Hovanes)<br />
*** Check CCAL <br />
**RF (Sergei)<br />
*** Not changed<br />
**Radiation monitors (Alexandre D.)<br />
*** Not changed <br />
*Detector systems<br />
**ST (Beni) <br />
*** Connect cables, check dark rate<br />
** FDC (Lubomir) <br />
*** Not changed<br />
** CDC (Beni)<br />
*** Move CDC1 crate to the nominal position, cable up<br />
*** Check readout<br />
** BCal (Mark D. / Elton) <br />
*** Not changed<br />
** FCal (Mark D.)<br />
*** Check / replace bases if needed<br />
** ComCal (Alex Somov)<br />
*** Check detector controls (Nick)<br />
*** Install CCAL platform<br />
*** Check platform motion <br />
*** Installed detector on the platform<br />
*** Connect cables<br />
*** Connect LMS<br />
*** Check detector<br />
**TOF (Beni) <br />