  • L1 trigger commissioning plans for the fall 2015 spring 2016 run
  • PS trigger (TAGM bias voltage calibration, TAGH, PS voltage scans, efficiency studies). Run TRD in parallel, if no problems.
- test/debug trigger (2 - 3 hours).
- production (1 - 2 night shifts)
run conditions depend on the accelerator performance (200 nA electron current, 10^-4 radiator, 10^-3 converter + Be converter, TBD)
  • Trigger for FDC alignment (ST/TOF + FCAL)
  • Trigger for FCAL MIPs calibration (ST & TOF)
- test/debug trigger (3 - 4 hours, CDC/FDC switched off)
- production at low luminosity with the FDC switched on (1 - 2 night shifts for both the FDC alignmnent and FCAL MIP triggers)
  • Debug FCAL/BCAL trigger
- trigger studies (3 - 4 hours)
- take data with the BCAL/FCAL trigger, FCAL/BCAL thresholds will be tuned, chambers can be switched on depending on run conditions (1 - 2 night shifts).
- test trigger performance at high rate. Take data with 'nominal' trigger thresholds.
  • Trigger generated by TAGM/TAGH
- trigger studies (3 - 4 hours)
- combine TAGH/TAGM with other trigger types.
- take data with the total absorption counter, 2x10-5 radiator, a few nA current (TBD) (2 - 3 hours)
  • Special trigger requests from sub-detectors