OWG meeting 11-Apr-2008

From GlueXWiki
Jump to: navigation, search

Agenda


Time/Location

2pm Fri 11-Apr-2008 CC F326


Announcements

Subsystem review likely Wed,Thurs 7,8-May.


Elke's Deadlines

  • Final presentations to Elke: 5-May close-of-business
  • Pre-brief material to reviewers: 30-April
  • Pre-brief material to Hall-D group to read: 23-April
  • Pre-brief outlines: 11-April


Next Meeting

2pm Fri 18-Apr-2008 CC F326


New Action Items from this Meeting

Minutes

Attendees: Elliott W, Simon T, Elton S, Alex S, Fernando B, Mark I, Dave D, Chris C, Jim S, Eugene C.

Admin has approved two new sorely-needed hires for the JLab DAQ group. Both will focus on hardware. One will work with Dave A, the other will work with Ed J.


Event Size Study - Alex S

  • See Alex's slides via link above.
  • David L out of town for this meeting, everything needs to be compared to his original results.
  • Studied rates and occupancies in all detectors.
  • Included EM background (100 ns gate) from Geant3.
  • Included hadronic signal and background from Pythia (Eugene's version).
  • Used simple trigger cuts (e.g. FCAL E>0.4 GeV), will redo using strategy from CNU Genetic Algorithm study.
  • 400 kHz hadronic rate at 10**8 photons/sec, L1 divide by 2 to 200 kHz, L3 divide by 10 to 20 kHz.
  • EM supplies major background, more than hadronic.
  • Advantage to tighten gates used in trigger to minimize EM background (Alex used 100 ns).
  • 10**8 tagged photons corresponds to about 3 10**8 in tagger, collimator removes about factor of 3.
  • Average number of hits in each detector in rough agreement with Dave L's results.
  • Most hits in FDC, 475 per event, of which 269 is due to EM background. Cuts are photon energy > 8 Gev, FCAL energy > 0.4 GeV
  • Most detectors hit count dominated by EM.
  • Some questions about photon cutoffs in simulation need to be resolved.
  • 100 ns may be too large a gate width.
  • Optimization needed: tighter gates may allow looser trigger, since events cleaned up
  • Alex will report again at the next meeting, will include summary tables, use CNU trigger algorithm, etc.
  • Need to estimate bytes-per-hit for each detector to get final average event size.


May 2008 Subsystem Review

  • Charge, agenda, and reviewers not final yet.
  • Outlines for pre-brief (due today) mostly done, see review page.
  • Electronics needs overview doc (Fernando will do this), otherwise coming along well.
  • Trigger needs outline (Alex will make first draft).
  • DAQ in good shape, most writing assignments done, Graham will edit and write overview doc.
  • Preliminary integration/monitoring/controls outline done, writing to start next week.