Loose ends from the run in Spring 2017

  • Communication issues (missing acknowledgments) between TI and TD
- new firmware for TI (tip76) provided by William
(installed on FCAL crates)
- new firmware for TD (tdp 73), includes some debugging features
- initially tested at high rate, have to continue with more tests
  • F1TDC initialization issues (32 ns time shift)
- reproduced using the test stand (Ed)
trying to reproduce/fix using BCAL cosmic trigger (work in progress)
  • Calibration constants for fadc250 (new firmware)
- new code for the clock distribution (Ben) has been implemented and is being
tested by Hai and Ed (successfully so far)
- additional ADC code will be provided by Ben shortly
- when ready, the new version will be tested using a single crate setup
(consider to install on some Hall-D crates, if successfully tested)
  • Performance of CAEN TDCs at high rate
- slows down readout at high trigger rate (R > 70 kHz)
we don't expect to run at these rates during Fall 2017/ Spring 2018
- prepared setup for testing (TOF/Trigger crates)


Other topics

  • Implementing SSP (GTP) readout (Ben)
- Ben is working on the new version of SSP now
- waiting for the VME readout function from Brian
  • Further optimization of the L1 algorithm for high-lumi runs
  • TOF trigger
- already implemented (FDC alignment, hi-pt meson production)
- may require some modification (specs, Iliya)
- test with Play Back, and beam tests
  • F1TDC firmware modification
- (suppression headers)
  • L1 trigger simulation
- version 0 of the simulation is available
- implement corrections in Geant for MIPs and hadronic showers
initial implementation in the simulation (v1), adopt code from
hyCal (Iliya, Alex)