Run Planning Meeting Notes, November 24 - November 30, 2022

From GlueXWiki
Jump to: navigation, search

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022


Wednesday Nov 30

Since the morning meeting

Updates from the last 24h

Issues

The plan

  • Consider filling the target later today

Shift Summaries

Tuesday Nov 29

Updates from the last 24h

  • Emptied the target on Monday morning.
  • Smooth running until 6am this morning BCAL fadc problems excluded from daq
  • No maintenance scheduled from MCC. HA down until estimated 9pm tonight, HB down, HC reconfiguring until tomorrow swing. The cavity with 0 field will be brought back online today.

Issues

The plan

  • Make an access to replace the 2 bad fadcs - BCAL N1-3-MID slot 4 and ROCFDC3 (rocid 53) slot 10.
  • Continue production running at 200nA with empty target until further notice. 1.2B triggers as of Tues 7:30am

Shift Summaries

Monday Nov 28

The plan

Achievements

  • Production running with full target, 15B triggers this cycle (Monday 8am)
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser
  • The top alcohol bubbler has been filled.
  • The empty Ar cylinder has been swapped out.

Issues

Drama (closed issues)

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
  • Monday 1am - NFS disk errors caused multiple DAQ problems. Sergey was called in.
  • Monday 2:30am CCAL HV unit D2-8_MID lost communication, reported 0 V restored after access to reboot

Shift Summaries