Difference between revisions of "Controls Meeting 27-Jun-2024"

From GlueXWiki
Jump to: navigation, search
Line 2: Line 2:
 
* Solenoid status  
 
* Solenoid status  
 
** PXI controller test with Windows (Brian)
 
** PXI controller test with Windows (Brian)
** New PLC controller (Josh)
+
** New PLC controller deployment (Josh)
 
** Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes)
 
** Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes)
 
* Power outage lessons
 
* Power outage lessons

Revision as of 16:11, 20 June 2024

  • Announcements
  • Solenoid status
    • PXI controller test with Windows (Brian)
    • New PLC controller deployment (Josh)
    • Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes)
  • Power outage lessons
  • PLC developments (Bobby, Josh)
    1. ECAL chillers
      • Chiller power
      • Flow monitoring
    2. Dark room environment sensors
    3. Fan control and fan status monitoring
    4. ECAL HV crate resets and HV board interlocks
    5. EPICS screens & L5X file
    6. Archiving and alarms for PLC-based PVs
  • ECAL and FCAL voltage controls (Hovanes)
  • Linux version for servers hosting EPICS IOC-s (Hovanes)
  • Other items


Time/Location

10:00am Thursday 27-June-2024