Line 5: Line 5:
 
** Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes)
 
** Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes)
 
* Power outage lessons
 
* Power outage lessons
 +
** PLC-s (Bobby)
 +
** EPICS (Hovanes)
 
* PLC developments (Bobby, Josh)
 
* PLC developments (Bobby, Josh)
 
*# ECAL  chillers  
 
*# ECAL  chillers  

Revision as of 08:41, 21 June 2024

  • Announcements
  • Solenoid status
    • PXI controller test with Windows (Brian)
    • New PLC controller deployment (Josh)
    • Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes)
  • Power outage lessons
    • PLC-s (Bobby)
    • EPICS (Hovanes)
  • PLC developments (Bobby, Josh)
    1. ECAL chillers
      • Chiller power
      • Flow monitoring
    2. Dark room environment sensors
    3. Fan control and fan status monitoring
    4. ECAL HV crate resets and HV board interlocks
    5. EPICS screens & L5X file
    6. Archiving and alarms for PLC-based PVs
  • ECAL and FCAL voltage controls (Hovanes)
  • Linux version for servers hosting EPICS IOC-s (Hovanes)
  • Other items


Time/Location

10:00am Thursday 27-June-2024