Difference between revisions of "July 9, 2024 KLONG KPT post Review Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Time and Place == Thursday January 18, 2024, 1pm * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin...")
 
(Agenda)
Line 6: Line 6:
 
== Agenda ==
 
== Agenda ==
  
* Review minutes from last meeting
+
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_18,_2024_KLONG_KPT_post_Review_Design_Meeting
 
* Discuss changes made as a result of the review last fall to prepare for procurements
 
* Discuss changes made as a result of the review last fall to prepare for procurements
  
 
** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page
 
** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page
 
  
 
== Minutes/Actions ==
 
== Minutes/Actions ==

Revision as of 10:13, 9 July 2024

Meeting Time and Place

Thursday January 18, 2024, 1pm

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard

Agenda

Minutes/Actions

  • Tungsten absorber changed from 15.2 cm square to 14.2 cm square
  • Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim)
    • Kapton is good for 6x10^9 RADS
  • Is there enough space for a profiler and active collimator?
    • Assume current AC and new profiler
    • Bring AC and profiler 3D models into existing KPT model (Keith)
  • Need to flip the location of the KPT assy to move north upon reinstall of GlueX (Keith)
  • Need to address thermal fatigue of tungsten and beryllium by June (Tim)
  • The review recommended an FMEA be performed for system failures such as cooling and power (Tim)
  • Need to develop a plan for decommissioning and design but not procure the needed items (Tim)
  • Make sure the tungsten composition is defined properly in power deposition and thermal models (Tim/Vitaly
  • Hall A had some experience with tungsten heating
  • We need to make sure RADCON approves the current design (Hovanes)
  • Need to reissue overall layout for review (Keith)

Action Items